AmazonUnknownPermittedDocumented building outlineVerified 2026-09-10
- Locality
- Smeaton Grange
- Published power
- 40 MW
Whether this operator sells GPU-hours is not established, so no price on GPUQuant refers to it.
- Planning Panels - Data Centre (PPS-2017SSW036) · NSW Department of Planning, Housing and Infrastructure · retrieved 2026-09-10
Construction and use of a warehouse distribution facility as a Data Centre, including carparking, fencing, landscaping and associated works
- Planning Panels - Section 4.55 modification to an approved data centre development (PPSSWC-242) · NSW Department of Planning, Housing and Infrastructure · retrieved 2026-09-10
Modification to building footprint, building layout, building design, modification to roof and installation of roof screening, increase in height, modification to external tanks and fencing.
- Sydney Western City Planning Panel Assessment Report, PPSSWC-242, 42B Bluett Drive Smeaton Grange · NSW Department of Planning, Housing and Infrastructure · retrieved 2026-09-10
The site is commonly known as 42B Bluett Drive, Smeaton Grange and is legally
- Sydney Western City Planning Panel Assessment Report, PPSSWC-242, 42B Bluett Drive Smeaton Grange · NSW Department of Planning, Housing and Infrastructure · retrieved 2026-09-10
whilst achieving the same functional capacity of approximately 40MW of IT
- Sydney Western City Planning Panel Business Paper, 610/2017, 2017SSW036 · NSW Department of Planning, Housing and Infrastructure · retrieved 2026-09-10
The proposed development is related in operation ( same operator for data storage
- Sydney Western City Planning Panel Business Paper, 610/2017, 2017SSW036 · NSW Department of Planning, Housing and Infrastructure · retrieved 2026-09-10
Smeaton Grange will also be occupied by the same operator.
- Amazon shores up property as it prepares to launch · Sydney Morning Herald · retrieved 2026-09-10
The other lease to Amazon Corporate Services, at Lot 4332, 42A Bluett Drive, Smeaton Grange, is also for 10 years, plus a 10-year option.
- AMAZON DATA CENTRE APPROVED · Western Sydney Business Access · retrieved 2026-09-10
SYDNEY Western Planning Panel has approved a $31 million data centre, at 42A Bluett Drive, Smeaton Grange, on land owned by Amazon Corporation Services Pty Ltd.
Cloud CarrierColocationDocumented building outlineVerified 2026-09-02
- Published power
- 28 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- DB1 - Cloud Carrier · Cloud Carrier · retrieved 2026-09-02
Data Building One (DB1) is a next-generation data centre purpose-built for AI, HPC, and data-intensive workloads, combining ultra-high-density computing with advanced liquid cooling to deliver exceptional performance, energy efficiency, and sustainability.
- DB1 - Cloud Carrier · Cloud Carrier · retrieved 2026-09-02
As the flagship facility of the Southern Highlands Data Campus, DB1 is purpose-built to scale AI infrastructure, redefining high-density computing and accelerating AI-driven innovation.
- DB1 - Cloud Carrier · Cloud Carrier · retrieved 2026-09-02
28MW
- About Us - Cloud Carrier · Cloud Carrier · retrieved 2026-09-02
At Cloud Carrier, we design, engineer, construct, and operate next-generation data centres optimised for ultra-high-density workloads.
- Campus - Cloud Carrier · Cloud Carrier · retrieved 2026-09-02
Our campus infrastructure offers a powered shell configuration, providing flexibility for AI-Ready and HPC workload environments.
- DB1 - Cloud Carrier · Cloud Carrier · retrieved 2026-09-02
Powered Shell
- Campus - Cloud Carrier · Cloud Carrier · retrieved 2026-09-02
Nestled in the picturesque Southern Highlands of New South Wales, SHDC boasts a prime location between the major cities of Sydney and Canberra.
Digital RealtyColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Erskine Park
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- SYD10 Data Center | 1-12 Templar Road | Digital Realty · Digital Realty · retrieved 2026-09-02
1-12 Templar Road, Erskine Park, NSW 2759
- SYD10 Data Center | 1-12 Templar Road | Digital Realty · Digital Realty · retrieved 2026-09-02
Our Sydney Data Center is located in the biggest tech startup ecosystem in Australia.
- SYD10 Data Center | 1-12 Templar Road | Digital Realty · Digital Realty · retrieved 2026-09-02
From single cabinets to full suites, we have space solutions as diverse as your needs.
- SYD10 Data Center | 1-12 Templar Road | Digital Realty · Digital Realty · retrieved 2026-09-02
Total building size
- Digital Realty Sydney SYD10 - PeeringDB · PeeringDB · retrieved 2026-09-02
1-12 Templar
Digital RealtyColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Erskine Park
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- SYD11 Data Center | 13-23 Templar Road | Digital Realty · Digital Realty · retrieved 2026-09-02
13-23 Templar Road, Erskine Park, NSW 2759
- SYD11 Data Center | 13-23 Templar Road | Digital Realty · Digital Realty · retrieved 2026-09-02
Adjacent to our existing data center and its vast connectivity opportunities, SYD11 is a highly resilient facility with over 3,300 m2 of customer space.
- SYD11 Data Center | 13-23 Templar Road | Digital Realty · Digital Realty · retrieved 2026-09-02
From single cabinets to private data center suites, solutions as diverse as your IT strategy.
- Digital Realty Sydney SYD11 - PeeringDB · PeeringDB · retrieved 2026-09-02
13-23 Templar Rd
EquinixColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Unanderra
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- SY7 · Equinix · retrieved 2026-09-02
Data centre and colocation services available at SY7 are ideal to support a wide range of companies.
- SY7 · Equinix · retrieved 2026-09-02
Colocation Space
- Equinix SY7 - Sydney (formerly Metronode Illawara 1) - PeeringDB · PeeringDB · retrieved 2026-09-02
8 Lathe Place
- SY7 · Equinix · retrieved 2026-09-02
Learn the security, power and cooling options provided by Equinix Sydney SY6 Data Center in Unanderra, NSW. See our network interconnection options, certifications and more
Leading Edge Data CentresColocationDocumented building outlineVerified 2026-09-02
- Locality
- Albury
- First announced
- 2020-12-01
- Published power
- 0.75 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Albury | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
ABX1
- Albury | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Located on the banks of the Murray River in the Riverina area of New South Wales, the location of the historic Hume dam, a gateway to the snowy mountains and home to the Wiradjuri Aboriginal people, Albury (and its sister city Wodonga) is home to over 8,000 businesses while its local government area spans just over 305 kilometres.
- Albury | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
750kW
- Albury | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
580
- Colocation | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
The data centre offers reliable power, cooling, and security for customers to host equipment in return for a monthly fee.
- LEDC - ABX1 - Albury - PeeringDB · PeeringDB · retrieved 2026-09-02
Avalon Drive - Aiport
- Lease Signed for Albury-Wodonga Edge Data Centre | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Lease Signed for Albury-Wodonga Edge Data Centre
- Leading Edge Opens Dubbo Data Centre, Forecasting 621 New Jobs and $106m per Year in Economic Growth For the Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Other NSW and Victorian locations in the pipeline include Albury, Wagga Wagga, Coffs Harbour, Bathurst, Shepparton, Bendigo, Ballarat, Geelong, Traralgon, Horsham and Mildura.
Leading Edge Data CentresColocationDocumented building outlineVerified 2026-09-02
- Locality
- Coffs Harbour
- First announced
- 2020-11-27
- Published power
- 0.3 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Coffs Harbour | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
CFS1
- Coffs Harbour | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Located on the Mid North Coast of New South Wales, known for its sandy white beaches, the Big Banana, and home to the Gumbaynggirr Aboriginal people, Coffs Harbour is home to over 6,000 businesses while its local government area spans just over 1,175 square kilometres.
- Coffs Harbour | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
300kW
- Coffs Harbour | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
212
- Colocation | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
The data centre offers reliable power, cooling, and security for customers to host equipment in return for a monthly fee.
- LEDC - CFS1 - Coffs Harbour - PeeringDB · PeeringDB · retrieved 2026-09-02
11 Enterprise Drive
- Leading Edge DC Breaks Ground in Coffs Harbour | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Leading Edge DC Breaks Ground in Coffs Harbour
- Leading Edge Opens Dubbo Data Centre, Forecasting 621 New Jobs and $106m per Year in Economic Growth For the Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Other NSW and Victorian locations in the pipeline include Albury, Wagga Wagga, Coffs Harbour, Bathurst, Shepparton, Bendigo, Ballarat, Geelong, Traralgon, Horsham and Mildura.
Leading Edge Data CentresColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Dubbo
- Published power
- 0.75 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Dubbo | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
DBO1
- Dubbo | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Located in the Central Western Plains of New South Wales, known for its main attraction of the Taronga Western Plains Zoo and home to the Tubbagah Aboriginal people, Dubbo is home to over 4,500 businesses while its local government area spans just over 7,500 square kilometres.
- Dubbo | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
750kW
- Dubbo | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
580
- Colocation | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
The data centre offers reliable power, cooling, and security for customers to host equipment in return for a monthly fee.
- LEDC - DBO1 - Dubbo - PeeringDB · PeeringDB · retrieved 2026-09-02
15 Jannali Road
- Leading Edge Opens Dubbo Data Centre, Forecasting 621 New Jobs and $106m per Year in Economic Growth For the Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
With 26 regional data centres in plan across New South Wales, Victoria and Queensland, LEDC has successfully opened data centres in Newcastle, Tamworth and Dubbo.
- Leading Edge Opens Dubbo Data Centre, Forecasting 621 New Jobs and $106m per Year in Economic Growth For the Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
On Friday, 10 December, the new data centre was opened in a ribbon-cutting ceremony with Member for the Dubbo electorate, Dugald Saunders and CEO of Dubbo Regional Council Murray Wood.
Leading Edge Data CentresColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Mayfield West
- Published power
- 1.5 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Newcastle | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
NTL1
- Newcastle | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Located in the Hunter region of New South Wales, known for being the gateway to the Hunter Valley wine region and home to the Worimi Aboriginal people, Newcastle is home to over 8,000 businesses while its local government area spans 184 square kilometres.
- Newcastle | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
1.5MW
- Newcastle | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
1160
- Colocation | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
The data centre offers reliable power, cooling, and security for customers to host equipment in return for a monthly fee.
- LEDC - NTL1 - Newcastle - PeeringDB · PeeringDB · retrieved 2026-09-02
1a Mcintosh Drive
- Leading Edge Opens Dubbo Data Centre, Forecasting 621 New Jobs and $106m per Year in Economic Growth For the Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
With 26 regional data centres in plan across New South Wales, Victoria and Queensland, LEDC has successfully opened data centres in Newcastle, Tamworth and Dubbo.
- Leading Edge Data Centres Opens its Doors to Bring New Investment in the Hunter Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
The Tier III data centre will support the growth of local businesses and attract new businesses to Newcastle, driving economic growth across the Hunter Region.
Leading Edge Data CentresColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Tamworth
- Published power
- 0.375 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Tamworth | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
TMW1
- Tamworth | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Located in the New England region of New South Wales, known for hosting the annual Tamworth Country Music Festival and home to the Kamilaroi Aboriginal people, Tamworth is home to just under 6,000 businesses while its local government area spans just under 10,000 kilometres.
- Tamworth | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
375kW
- Tamworth | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
290
- Colocation | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
The data centre offers reliable power, cooling, and security for customers to host equipment in return for a monthly fee.
- LEDC - TMW1 - Tamworth - PeeringDB · PeeringDB · retrieved 2026-09-02
140 Johnston Stret
- Leading Edge Opens Dubbo Data Centre, Forecasting 621 New Jobs and $106m per Year in Economic Growth For the Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
With 26 regional data centres in plan across New South Wales, Victoria and Queensland, LEDC has successfully opened data centres in Newcastle, Tamworth and Dubbo.
- Tamworth Data Centre Grand Opening | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
On 5 November 2021, Leading Edge Data Centres opened our doors.
Leading Edge Data CentresColocationDocumented building outlineVerified 2026-09-02
- Locality
- Turvey Park
- First announced
- 2020-10-28
- Published power
- 0.3 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Wagga Wagga | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
WGA1
- Wagga Wagga | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Located on the banks of the Murrumbidgee River in the Riverina region of New South Wales, known for being Australia’s largest inland city and home to the Wiradyuri Aboriginal people, Wagga Wagga is home to over 5950 businesses while its local government area spans over 4,800 square kilometres.
- Wagga Wagga | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
300kW
- Wagga Wagga | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
212
- Colocation | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
The data centre offers reliable power, cooling, and security for customers to host equipment in return for a monthly fee.
- LEDC - WGA1 - Wagga Wagga - PeeringDB · PeeringDB · retrieved 2026-09-02
136 Urana Street
- PRIME7 News in Wagga Wagga | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Leading Edge Data Centres CEO and Founder Chris Thorpe discusses the new Edge Data Centre which will be built in Wagga Wagga in 2021 on PRIME7 News in Wagga Wagga NSW.
- Leading Edge Opens Dubbo Data Centre, Forecasting 621 New Jobs and $106m per Year in Economic Growth For the Region | Leading Edge Data Centres · Leading Edge Data Centres · retrieved 2026-09-02
Other NSW and Victorian locations in the pipeline include Albury, Wagga Wagga, Coffs Harbour, Bathurst, Shepparton, Bendigo, Ballarat, Geelong, Traralgon, Horsham and Mildura.