Leading Edge Data Centres / Turvey Park / NSW / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
WGA1
Located on the banks of the Murrumbidgee River in the Riverina region of New South Wales, known for being Australia’s largest inland city and home to the Wiradyuri Aboriginal people, Wagga Wagga is home to over 5950 businesses while its local government area spans over 4,800 square kilometres.
300kW
212
The data centre offers reliable power, cooling, and security for customers to host equipment in return for a monthly fee.
Leading Edge Data Centres CEO and Founder Chris Thorpe discusses the new Edge Data Centre which will be built in Wagga Wagga in 2021 on PRIME7 News in Wagga Wagga NSW.
Other NSW and Victorian locations in the pipeline include Albury, Wagga Wagga, Coffs Harbour, Bathurst, Shepparton, Bendigo, Ballarat, Geelong, Traralgon, Horsham and Mildura.
136 Urana Street
Building outlines © OpenStreetMap contributors, ODbL. Licence