UnknownPermittedStreet address, drawn as a pointVerified 2026-09-11
- Locality
- Red Oak
Whether this operator sells GPU-hours is not established, so no price on GPUQuant refers to it.
- Central Registry Query - Regulated Entity Information, RN110852753 · Texas Commission on Environmental Quality · retrieved 2026-09-11
Name: ALAMO MISSION Primary Business: DATA CENTER Street Address: 500 E OVILLA RD, RED OAK TX 75154
- Central Registry Query - Regulated Entity Information, RN110852753 · Texas Commission on Environmental Quality · retrieved 2026-09-11
CN605700061 ALAMO MISSION LLC OWNER OPERATOR
- Central Registry Query - Regulated Entity Information, RN110852753 · Texas Commission on Environmental Quality · retrieved 2026-09-11
AIR NEW SOURCE PERMITS REGISTRATION 167790 ACTIVE
Aligned Data CentersColocationDocumented building outlineVerified 2026-09-02
- Locality
- Mansfield
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Sustainable, AI-Ready Data Centers in Dallas Fort Worth | Aligned · Aligned Data Centers · retrieved 2026-09-02
3801 Britton Rd. Mansfield, TX
- Sustainable, AI-Ready Data Centers in Dallas Fort Worth | Aligned · Aligned Data Centers · retrieved 2026-09-02
DFW-03 Data Center
AMDNot a compute operatorOperationalNamed site, drawn as a pointVerified 2026-09-11
- Locality
- Austin
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- AMD Form 10-K for fiscal year ended December 27, 2025 · Advanced Micro Devices, Inc. (SEC Form 10-K) · retrieved 2026-09-11
Our headquarters are located in Santa Clara, California, and we have significant operations in Austin, Texas; San Jose, California; Shanghai, China; Markham, Ontario, Canada; Longmont, Colorado; Dublin, Ireland; Singapore; and Bengaluru and Hyderabad, India.
- AMD Locations · AMD · retrieved 2026-09-11
7171 Southwest Parkway Austin, TX 78735 United States
CoherentNot a compute operatorOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Sherman
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Coherent Announces a CHIPS Letter of Intent for $50 Million to Expand World-Leading Manufacturing Facility for AI Infrastructure · Coherent · retrieved 2026-09-11
Coherent’s Sherman facility manufactures photonic devices based on InP, a specialized semiconductor material used to create high-performance optical networking components that power modern AI systems.
- Coherent Corp. Form 10-K for fiscal year ended June 30, 2026 · Coherent Corp. · retrieved 2026-09-11
We are investing in manufacturing capacity for the Datacenter and Communications markets, including expanding our indium phosphide capacity in Sherman, Texas, to address our increased customer demand and industry-wide shortage.
- The World's First 6-inch InP Scalable Wafer Fabs | Coherent · Coherent · retrieved 2026-09-11
Coherent recently announced the world’s first 6-inch capability for InP wafer fabrication in the company’s Sherman, Texas, and Järfälla, Sweden wafer fabs.
Compass DatacentersColocationUnder constructionNamed site, drawn as a pointVerified 2026-09-03
- Locality
- Red Oak
- First announced
- 2020-01-29
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Data Center Markets | Compass Datacenters · Compass Datacenters · retrieved 2026-09-03
360 MW Red Oak development nearing completion
- Dallas' Compass Datacenters to Spend $200 Million in Red Oak · Compass Datacenters · retrieved 2026-09-03
develops and operates sustainable Class A, Community-First campuses
- Compass Datacenters Adds Second Dallas Area Campus · Compass Datacenters · retrieved 2026-09-10
The Red Oak Campus will provide capacity to hyperscale, cloud and enterprise customers.
- Compass Datacenters Adds Second Dallas Area Campus · Compass Datacenters · retrieved 2026-09-10
The first data center, a six-megawatt facility, is scheduled for delivery in Q2 2020.
- Compass Datacenters Adds Second Dallas Area Campus · Compass Datacenters · retrieved 2026-09-10
The campus is supported by multiple carriers with access to diverse fiber routes and a dedicated high-voltage power substation.
- Data Center Markets · Compass Datacenters · retrieved 2026-09-10
With our 360 MW Red Oak development nearing completion, Compass is expanding its footprint across this critical U.S. market.
Core ScientificColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- Pecos
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Pecos, Texas Data Center (Cottonwood 1 & 2) · Core Scientific · retrieved 2026-09-10
The Pecos, Texas, data center is strategically located in west Texas within the Permian Basin.
- Pecos, Texas Data Center (Cottonwood 1 & 2) · Core Scientific · retrieved 2026-09-10
The Pecos, Texas, data center capitalizes on low-cost power availability to deliver efficiency and reliability for high-density workloads.
CrusoeNeocloudUnder constructionDocumented building outlineVerified 2026-09-10
- Locality
- Abilene
- An inside look at the Abilene AI data center · Crusoe · retrieved 2026-09-10
Crusoe is deeply committed to partnering with the Abilene community.
- An inside look at the Abilene AI data center · Crusoe · retrieved 2026-09-10
The initial fill for the closed-loop system in each of the eight buildings requires one million gallons of water, sourced from the municipal water supply.
- An inside look at the Abilene AI data center · Crusoe · retrieved 2026-09-10
Today, we have more than 5,600 construction workers on-site every day, contributing directly to the local economy.
- An inside look at the Abilene AI data center · Crusoe · retrieved 2026-09-10
The Development Corporation of Abilene (DCOA) estimates that the first two buildings of the project will generate approximately $1 billion in direct and indirect economic impact to the City of Abilene over the next 20 years.
- Lancium Clean Campus for AI Data Centers, Abilene, Texas · Lancium · retrieved 2026-09-10
Our flagship campus project is Stargate 1 located in Abilene, TX.
- Lancium Clean Campus for AI Data Centers, Abilene, Texas · Lancium · retrieved 2026-09-10
Our Abilene campus features a 1.2GW interconnect, which has been fully approved by ERCOT and undergone a rigorous, formal review process in collaboration with transmission service providers.
CyrusOneColocationOperationalDocumented building outlineVerified 2026-09-03
- Locality
- Allen
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Allen, TX: DFW3-DFW5 | CyrusOne · CyrusOne · retrieved 2026-09-03
campus includes the DFW3 and DFW4 data centers, with DFW5 representing landbank for future development
- Allen, TX: DFW3-DFW5 | CyrusOne · CyrusOne · retrieved 2026-09-03
Located in the Dallas suburb of Allen, TX
- Allen, TX: DFW3-DFW5 | CyrusOne · CyrusOne · retrieved 2026-09-03
DFW3 and DFW4 provide 77 MW of IT capacity.
CyrusOneColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- Allen
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Allen, TX: DFW3-DFW5 · CyrusOne · retrieved 2026-09-10
Located in the Dallas suburb of Allen, TX, CyrusOne's campus includes the DFW3 and DFW4 data centers, with DFW5 representing landbank for future development.
- Allen, TX: DFW3-DFW5 · CyrusOne · retrieved 2026-09-10
DFW3 and DFW4 provide 77 MW of IT capacity.
- Allen, TX: DFW3-DFW5 · CyrusOne · retrieved 2026-09-10
With over 90 acres, CyrusOne's Allen, Texas facilities make up the largest data center campus in Texas.
CyrusOneColocationOperationalNamed site, drawn as a pointVerified 2026-09-03
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Austin, TX: AUS2-AUS3 | CyrusOne · CyrusOne · retrieved 2026-09-03
Met Center business park just seven minutes from Austin-Bergstrom International Airport
- Austin, TX: AUS2-AUS3 | CyrusOne · CyrusOne · retrieved 2026-09-03
AUS2 and AUS3 data centers provide a combined 242,000 sq. ft. of IT technical space
- Austin, TX: AUS2-AUS3 | CyrusOne, Key Features · CyrusOne · retrieved 2026-09-03
19 MW
CyrusOneColocationUnder constructionDocumented building outlineVerified 2026-09-10
- Locality
- San Antonio
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- CyrusOne Breaks Ground on Fifth Data Center Campus in San Antonio · CyrusOne · retrieved 2026-09-10
recently celebrated the groundbreaking of its fifth data center campus in San Antonio
- CyrusOne Breaks Ground on Fifth Data Center Campus in San Antonio · CyrusOne · retrieved 2026-09-10
The CyrusOne data center campus, located in Texas Research Park, is one of the most well established and innovative business development complexes in the San Antonio market
- CyrusOne Breaks Ground on Fifth Data Center Campus in San Antonio · CyrusOne · retrieved 2026-09-10
The new campus will feature two buildings with a total of 276,000 square feet of space delivering an IT capacity of 36 megawatts.
CyrusOneColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- San Antonio
- Published power
- 9 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- San Antonio, TX: SAT1 | CyrusOne · CyrusOne · retrieved 2026-09-02
SAT1 data center in San Antonio delivers 9 MW of IT capacity
- San Antonio, TX: SAT1 | CyrusOne · CyrusOne · retrieved 2026-09-02
Located west of downtown San Antonio off state highway 151
- San Antonio, TX: SAT1 | CyrusOne · CyrusOne · retrieved 2026-09-02
110,000 sq. ft.
CyrusOneColocationOperationalStreet address, drawn as a pointVerified 2026-09-11
- Locality
- San Antonio
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Central Registry Query - Regulated Entity Information, RN110660743 · Texas Commission on Environmental Quality, Central Registry · retrieved 2026-09-11
Primary Business: DATA CENTER Street Address: 9554 WESTOVER HILLS BLVD, SAN ANTONIO TX 78251 2702
- Central Registry Query - Regulated Entity Information, RN110660743 · Texas Commission on Environmental Quality, Central Registry · retrieved 2026-09-11
CN Number Customer Name Customer Role(s) Details CN604843086 CYRUSONE LLC OWNER OPERATOR
- SAT2-SAT4 | CyrusOne · CyrusOne · retrieved 2026-09-11
Located west of downtown San Antonio off state highway 151, this expansive campus combines state-of-the-art facilities spanning 295,785 sq. ft. of technical space.
Data FoundryColocationOperationalDocumented building outlineVerified 2026-09-03
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Contact Us | Data Foundry, Our Locations · Data Foundry · retrieved 2026-09-03
7401 E Ben White Blvd #1000,
- Austin 1 Data Center | Data Foundry · Data Foundry · retrieved 2026-09-03
Our Data Foundry 00 data center is a 40,000 square foot facility
Data FoundryColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Austin Data Centers | Data Foundry · Data Foundry · retrieved 2026-09-10
Texas 2 opened in early 2018. It is our third data center in Austin.
- Texas 2 Data Center | Data Foundry · Data Foundry · retrieved 2026-09-10
Data Foundry 02 is a purpose-built, dually-fed data center that provides wholesale and retail colocation for deployments of all sizes.
- Data Foundry 02 Data Center Specification Sheet · Data Foundry · retrieved 2026-09-10
Located on the Data Ranch 43.5-acre property
Data FoundryColocationOperationalNamed site, drawn as a pointVerified 2026-09-03
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Contact Us | Data Foundry, Our Locations · Data Foundry · retrieved 2026-09-03
4100 Smith School Rd, Bldg 1
- Contact Us | Data Foundry, Our Locations · Data Foundry · retrieved 2026-09-03
4100 Smith School Rd, Bldg 2
- Texas 1 Data Center | Data Foundry · Data Foundry · retrieved 2026-09-03
purpose-built data center powered by independent substations
- Data Foundry 02 Data Center | Data Foundry · Data Foundry · retrieved 2026-09-03
Data Foundry 02 is a purpose-built, dually-fed data center
Data FoundryColocationOperationalDocumented building outlineVerified 2026-09-03
- Locality
- Houston
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Contact Us | Data Foundry, Our Locations · Data Foundry · retrieved 2026-09-03
660 Greens Pkwy,
- Houston 2 Data Center | Data Foundry · Data Foundry · retrieved 2026-09-03
Houston 2 is a 60-MW, master-planned data center
Dell TechnologiesNot a compute operatorOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Round Rock
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Dell Technologies Inc. Form 10-K for the fiscal year ended January 30, 2026 · Dell Technologies Inc. (SEC Form 10-K) · retrieved 2026-09-11
Our principal executive offices and global headquarters are located at One Dell Way, Round Rock, Texas.
Digital RealtyColocationDocumented building outlineVerified 2026-09-03
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- AUS11 Data Center | 7500 Metro Center Drive | Digital Realty · Digital Realty · retrieved 2026-09-03
7500 Metro Center Drive, Austin, TX 78744
- AUS11 Data Center | 7500 Metro Center Drive | Digital Realty · Digital Realty · retrieved 2026-09-03
data center in Austin at 7500 Metro Center Drive is in one of the hottest tech communities in the world
- AUS11 Data Center | 7500 Metro Center Drive | Digital Realty, specifications · Digital Realty · retrieved 2026-09-03
Total building size
Element CriticalColocationOperationalDocumented building outlineVerified 2026-09-03
- Locality
- Austin
- Published power
- 9.5 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Austin Data Center | Texas Colocation | Element Critical · Element Critical · retrieved 2026-09-03
8025 North Interstate Hwy 35
- Austin Data Center | Texas Colocation | Element Critical · Element Critical · retrieved 2026-09-03
62,300 SF Colocation
- Austin Data Center | Texas Colocation | Element Critical · Element Critical · retrieved 2026-09-03
9.5 MW
- Austin Data Center | Texas Colocation | Element Critical · Element Critical · retrieved 2026-09-03
Our Austin data center is designed to support businesses of all sizes, offering a range of colocation solutions.
EntegrisNot a compute operatorOperationalNamed site, drawn as a pointVerified 2026-09-11
- Locality
- Burnet
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Entegris, Inc. Annual Report on Form 10-K for fiscal year 2025 · Entegris · retrieved 2026-09-11
We have also expanded capacity at existing facilities, including liquid filtration in Billerica, Massachusetts and Yonezawa, Japan, deposition materials in Toronto, Ontario, materials handling in Chaska, Minnesota and JangAn, Korea, CMP filter and CMP slurries in Taiwan, SiC slurries in Aurora, Illinois and solid precursors in Burnet, Texas.
- Locations | Entegris · Entegris · retrieved 2026-09-11
706 Houston Clinton Drive, Burnet, TX 78611 USA
Galaxy DigitalColocationOperationalDocumented building outlineVerified 2026-09-10
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Galaxy's Helios AI & HPC Data Center Campus · Galaxy · retrieved 2026-09-10
Galaxy is one of Dickens County’s top employers, providing competitive salaries and exceptional benefits for our employees, helping to further strengthen local communities.
- Galaxy's Helios AI & HPC Data Center Campus · Galaxy · retrieved 2026-09-10
Helios is staffed with on-site support teams, security, power market engineers, and expert technicians.
- Galaxy To Acquire Helios Bitcoin Mining Facility From Argo Blockchain · Galaxy · retrieved 2026-09-10
Galaxy has also pledged to support the various community commitments Argo has established since it began building Helios in July 2021.
- Galaxy To Acquire Helios Bitcoin Mining Facility From Argo Blockchain · Galaxy · retrieved 2026-09-10
Helios, which sits on a 160-acre campus, commenced operations in May 2022 and is currently staffed by approximately 40 employees who manage day-to-day operations.
- Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave · Galaxy · retrieved 2026-09-10
Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave
- Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave · Galaxy · retrieved 2026-09-10
Our 1.6 GW Helios campus in Texas positions Galaxy among the largest and fastest-growing data center developers in North America.
GlobalWafersNot a compute operatorOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Sherman
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- GlobalWafers Co., Ltd. 2020 Annual Report · GlobalWafers · retrieved 2026-09-11
Texas Plant Address: 200 F.M. 1417 West Sherman, Texas, USA 75092
GoogleHyperscalerOperationalNamed site, drawn as a pointVerified 2026-09-02
- Locality
- Midlothian
- First announced
- 2019-06-14
- Texas - Google Data Center Location · Google · retrieved 2026-09-02
The Lone Star State is home to two of our data center locations in Midlothian and Red Oak in Ellis County, Texas.
- Texas - Google Data Center Location, Milestones of progress, 2019 · Google · retrieved 2026-09-02
Google invests in our first Texas data center in Midlothian.
- Coming soon to the Lone Star State: more office space and a data center · Google · retrieved 2026-09-02
extending our commitment to the state with a new data center in Midlothian
- Coming soon to the Lone Star State: more office space and a data center · Google · retrieved 2026-09-02
investing $600 million to develop the Midlothian site
- Texas - Google Data Center Location · Google · retrieved 2026-09-10
Google announces another investment to build a second Texas data center in Red Oak.
- Texas - Google Data Center Location · Google · retrieved 2026-09-10
Google has proudly called Texas home since 2009 with offices in Austin and Dallas and data centers in Ellis County.
GoogleHyperscalerOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Red Oak
- Texas – Google Data Center Location · Google · retrieved 2026-09-11
The Lone Star State is home to two of our data center locations in Midlothian and Red Oak in Ellis County, Texas.
- Texas – Google Data Center Location · Google · retrieved 2026-09-11
Google announces another investment to build a second Texas data center in Red Oak.
H5 Data CentersColocationOperationalDocumented building outlineVerified 2026-09-02
- Locality
- San Antonio
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- San Antonio Data Center - H5 Data Centers · H5 Data Centers · retrieved 2026-09-02
100 Taylor St. - San Antonio, TX 78205
- San Antonio Data Center - H5 Data Centers · H5 Data Centers · retrieved 2026-09-02
San Antonio location is comprised of 85,000 SF of colocation space across two facilities
Hewlett Packard EnterpriseNot a compute operatorOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Spring
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Hewlett Packard Enterprise Form 10-K for the fiscal year ended October 31, 2025 · Hewlett Packard Enterprise Company (SEC Form 10-K) · retrieved 2026-09-11
Our principal executive offices, including our global headquarters, are located at 1701 East Mossy Oaks Road, Spring, Texas, 77389, United States of America.
LightEdgeColocationOperationalDocumented building outlineVerified 2026-09-03
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Austin, TX Colocation Data Centers | LightEdge · LightEdge · retrieved 2026-09-03
2916 Montopolis Dr, Suite 300 Austin, TX 78741
- Austin, TX Colocation Data Centers | LightEdge · LightEdge · retrieved 2026-09-03
Austin Data Center #1
- Austin, TX Colocation Data Centers | LightEdge · LightEdge · retrieved 2026-09-03
Our Austin facilities are move-in ready and fully scalable
LightEdgeColocationOperationalDocumented building outlineVerified 2026-09-03
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Austin, TX Colocation Data Centers | LightEdge · LightEdge · retrieved 2026-09-03
7000-B Burleson Road, Suite 100, Austin, TX 78744
- Austin, TX Colocation Data Centers | LightEdge · LightEdge · retrieved 2026-09-03
Our Austin facilities are move-in ready and fully scalable
LOGIX Fiber NetworksColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- Austin
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- LOGIX Austin Data Centers | Austin Colocation · LOGIX Fiber Networks · retrieved 2026-09-10
The LOGIX Austin data center is the right colocation choice because it offers a highly reliable infrastructure, robust connectivity options, flexible and scalable space, and customized solutions.
- Austin Data Center 1905 E. 6th Street, Austin, TX 78702 · LOGIX Fiber Networks · retrieved 2026-09-10
Logix's Austin data center is a unique, world-class facility strategically positioned east of Austin's central business district.
MARAPrivateOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Granbury
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
- MARA Granbury: Advanced Data Center & Community Engagement · MARA · retrieved 2026-09-02
MARA is the new owner and operator of the digital asset data center in Hood County, Texas.
- MARA Granbury: Advanced Data Center & Community Engagement · MARA · retrieved 2026-09-02
By running our data center, we help ensure that power is being consistently generated

MDC Data CentersColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- El Paso
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Carrier Neutral Data Center in El Paso, TX | MDC Data Centers · MDC Data Centers · retrieved 2026-09-10
11455 CEDAR OAK DR. EL PASO, TX 79936.
- Carrier Neutral Data Center in El Paso, TX | MDC Data Centers · MDC Data Centers · retrieved 2026-09-10
We are the first 100% carrier-neutral data center in El Paso.
- Carrier Neutral Data Center in El Paso, TX | MDC Data Centers · MDC Data Centers · retrieved 2026-09-10
MDC El Paso has a redundant infrastructure, reliable and secure so that you can focus on your business.
MetaPrivateOperationalNamed site, drawn as a pointVerified 2026-09-02
- Locality
- Fort Worth
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
- Meta's Fort Worth Data Center (info sheet, PDF) · Meta · retrieved 2026-09-02
Since our Fort Worth Data Center became operational in 2017
- Meta's Fort Worth Data Center (info sheet, PDF) · Meta · retrieved 2026-09-02
Broke ground on the Fort Worth Data Center
- Building Texas - How Meta invests in jobs, infrastructure and communities across the state · Meta · retrieved 2026-09-02
our data centers are supporting thousands of jobs, funding local infrastructure, adding clean energy to the grid, and supporting local schools and nonprofits
MetaPrivateOperationalDocumented building outlineVerified 2026-09-10
- Locality
- Temple
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
- Building Texas - How Meta invests in jobs, infrastructure and communities across the state · Meta · retrieved 2026-09-10
Across three communities — Fort Worth, Temple, and El Paso — our data centers are supporting thousands of jobs, funding local infrastructure, adding clean energy to the grid, and supporting local schools and nonprofits.
- Building Texas - How Meta invests in jobs, infrastructure and communities across the state · Meta · retrieved 2026-09-10
$1.7M+ in direct funding to Bell County-area schools and nonprofits through 55+ grants since 2022
MicrosoftHyperscalerOperationalDocumented building outlineVerified 2026-09-10
- Locality
- San Antonio
- Microsoft buys $80 million data center on far West Side · MySA (San Antonio Express-News) · retrieved 2026-09-10
The corporation bought the 34-acre, 202,000 square-foot center at 5200 Rogers Road for an undisclosed price on Tuesday from Chevron, the California-based energy company, property records show.
- Microsoft buys $80 million data center on far West Side · MySA (San Antonio Express-News) · retrieved 2026-09-10
Microsoft Corp. purchased an $80 million data center on the far West Side this week, continuing its 12-year effort to cluster data centers in San Antonio.
MicrosoftHyperscalerUnder constructionDocumented building outlineVerified 2026-09-03
- Locality
- San Antonio
- County Road 381 datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-03
Microsoft is building a datacenter on County Road 381 in San Antonio, Texas.
- County Road 381 datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-03
Construction work continues along County Road 381.
- Texas - Microsoft Local, Greater San Antonio · Microsoft · retrieved 2026-09-03
Microsoft operates datacenters in the counties of Bexar and Medina
MicrosoftHyperscalerNamed site, drawn as a pointVerified 2026-09-03
- Locality
- San Antonio
- Lambda Drive datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-03
Microsoft is developing a datacenter campus on Lambda Drive in San Antonio, Texas.
- Texas - Microsoft Local, Greater San Antonio · Microsoft · retrieved 2026-09-03
Microsoft operates datacenters in the counties of Bexar and Medina
MicrosoftHyperscalerOperationalDocumented building outlineVerified 2026-09-10
- Locality
- Castroville
- Architectural Barriers Project Details, TABS2023024474, SAT 81 - Package 2 · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Facility Name: SAT 81 Data Center Location Address: 18844 FM 1957 Castroville, TX 78009 Location County: Medina
- Architectural Barriers Project Details, TABS2023024474, SAT 81 - Package 2 · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Owner Name: Microsoft Owner Address: One Microsoft Way Redmond, Washington 98052
- Architectural Barriers Project Details, TABS2023024474, SAT 81 - Package 2 · Texas Department of Licensing and Regulation · retrieved 2026-09-10
New Data Center with Admin Building, finish out of Colo 1 and Shell of Colo 2. Equipment in utility yards and related civil and landscaping are also included.
- Architectural Barriers Project Details, TABS2023024474, SAT 81 - Package 2 · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Are the private funds provided by the tenant? No Current Status: Inspection Complete
- Texas - Microsoft Local · Microsoft · retrieved 2026-09-10
Microsoft operates datacenters in the counties of Bexar and Medina, in the Greater San Antonio area.
MicrosoftHyperscalerUnder constructionDocumented building outlineVerified 2026-09-10
- Locality
- Castroville
- Architectural Barriers Project Details, TABS2024023976, SAT82 Data Center · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Facility Name: SAT82 Data Center Location Address: 18844 FM 1957 Castroville Castroville, TX 78009 Location County: Medina
- Architectural Barriers Project Details, TABS2024023976, SAT82 Data Center · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Owner Name: Microsoft Corporation Owner Address: One Microsoft Way Richmond, Washington 98052
- Architectural Barriers Project Details, TABS2024023976, SAT82 Data Center · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Construction of one story building with 5 colos for a Data Center. Approximate 244,676 square foot of gross building area
- Architectural Barriers Project Details, TABS2024023976, SAT82 Data Center · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Start Date: 4/11/2026 Completion Date: 2/8/2028 Estimated Cost: $482,600,000 Type of Work: New Construction
- Texas - Microsoft Local · Microsoft · retrieved 2026-09-10
Microsoft operates datacenters in the counties of Bexar and Medina, in the Greater San Antonio area.
MicrosoftHyperscalerOperationalDocumented building outlineVerified 2026-09-10
- Locality
- San Antonio
- Central Registry Regulated Entity RN110636149, SENTRY GATEWAY DATA CENTER · Texas Commission on Environmental Quality · retrieved 2026-09-10
Primary Business: DATA CENTER OPERATIONS Street Address: 1050 DEMOCRACY BLVD, SAN ANTONIO TX 78251
- Central Registry Regulated Entity RN110636149, SENTRY GATEWAY DATA CENTER · Texas Commission on Environmental Quality · retrieved 2026-09-10
CN Number Customer Name Customer Role(s) Details CN603222902 MICROSOFT CORPORATION OWNER OPERATOR
- Architectural Barriers Project Details, TABS2021008977, EX West Green Data Center Phase 2 · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Phase 2 of project on 28.05 acre greenfield site. Includes small one story Ops Office Building, storage containers, modular data center containers (MDCs; equipment) with supporting elec and mech equipment, exterior yards, and covered walkways.
- Architectural Barriers Project Details, TABS2021008977, EX West Green Data Center Phase 2 · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Facility Name: EX West Green Data Center Location Address: 1050 Democracy San Antonio, TX 78251 Location County: Bexar
- Architectural Barriers Project Details, TABS2021008977, EX West Green Data Center Phase 2 · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Start Date: 1/31/2021 Completion Date: 3/27/2023 Estimated Cost: $279,988,945 Type of Work: New Construction
- Building Permits, Permits Issued, datastore query for Microsoft projects at 1050 Democracy · City of San Antonio · retrieved 2026-09-10
"PROJECT NAME": "SPC-Site Work-Microsoft-GRN01-03 400G-1050 DEMOCRACY", "ADDRESS": "1050 DEMOCRACY, City of San Antonio, TX 78251"
- Building Permits, Permits Issued, datastore query for the 1050 Democracy address point · City of San Antonio · retrieved 2026-09-10
"ADDRESS": "1050 DEMOCRACY, City of San Antonio, TX 78251", "X_COORD": "-98.644088", "Y_COORD": "29.444978"
- Texas - Microsoft Local · Microsoft · retrieved 2026-09-10
Microsoft operates datacenters in the counties of Bexar and Medina, in the Greater San Antonio area.
MicrosoftHyperscalerUnder constructionDocumented building outlineVerified 2026-09-02
- Locality
- San Antonio
- Westover Link datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-02
Microsoft is building a datacenter on Westover Link in San Antonio, Texas.
- Westover Link datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-02
Microsoft and its general contractor, Walbridge have begun site clearing and excavation for the project.
- Westover Link datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-02
Our team is permitted for site clearing work through the City of San Antonio
- Texas - Microsoft Local, Greater San Antonio · Microsoft · retrieved 2026-09-02
Microsoft operates datacenters in the counties of Bexar and Medina, in the Greater San Antonio area.
MicrosoftHyperscalerDocumented building outlineVerified 2026-09-03
- Locality
- San Antonio
- Wiseman Boulevard datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-03
Microsoft is building a datacenter on Wiseman Boulevard in San Antonio, Texas.
- Wiseman Boulevard datacenter construction update - Microsoft Local · Microsoft · retrieved 2026-09-03
Construction is estimated to be complete in March 2026
- Texas - Microsoft Local, Greater San Antonio · Microsoft · retrieved 2026-09-03
Microsoft operates datacenters in the counties of Bexar and Medina
Oracle Cloud InfrastructureNot a compute operatorOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Austin
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Oracle Corporation Form 10-K, fiscal year 2026 · Oracle Corporation · retrieved 2026-09-11
Our headquarters facility consists of approximately 0.9 million square feet in Austin, Texas, all of which we own.
QTS Data CentersColocationDocumented building outlineVerified 2026-09-03
- Locality
- Fort Worth
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Fort Worth - QTS Data Centers · QTS Data Centers · retrieved 2026-09-03
FTW1 DC1
- Fort Worth - QTS Data Centers · QTS Data Centers · retrieved 2026-09-03
our Fort Worth location has significant power and space to support customer growth
- Fort Worth - QTS Data Centers, Critical Campus Capacity · QTS Data Centers · retrieved 2026-09-03
70 MW+ of critical campus capacity
QTS Data CentersColocationDocumented building outlineVerified 2026-09-02
- Locality
- San Antonio
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- San Antonio - QTS Data Centers · QTS Data Centers · retrieved 2026-09-02
Location 8535 Potranco Road, San Antonio, Texas 78251
- San Antonio - QTS Data Centers · QTS Data Centers · retrieved 2026-09-02
San Antonio, Texas data center campus is strategically located to connect to the
- San Antonio - QTS Data Centers, Critical Campus Capacity · QTS Data Centers · retrieved 2026-09-02
90 MW+
Riot PlatformsPrivateOperationalStreet address, drawn as a pointVerified 2026-09-11
- Locality
- Corsicana
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
- Central Registry Query - Regulated Entity Information, RN111580759 · Texas Commission on Environmental Quality, Central Registry · retrieved 2026-09-11
Name: RIOT Primary Business: CRYPTOCURRENCY MINING Street Address: 6980 FM 709 S, CORSICANA TX 75110 9338
- Central Registry Query - Regulated Entity Information, RN111580759 · Texas Commission on Environmental Quality, Central Registry · retrieved 2026-09-11
CN605736156 WHINSTONE US INC OWNER OPERATOR CN606364529 RIOT CORSICANA LLC OWNER OPERATOR
- Riot Platforms, Inc. Form 10-Q for the quarter ended June 30, 2026 · Riot Platforms, Inc. (SEC Form 10-Q) · retrieved 2026-09-11
During the year ended December 31, 2024, the Company’s subsidiary, Riot Corsicana, LLC, entered into a requirements contract with MEMS Industrial Supply
- Riot Platforms, Inc. Form 10-Q for the quarter ended June 30, 2026 · Riot Platforms, Inc. (SEC Form 10-Q) · retrieved 2026-09-11
The Company provides mission-critical power and infrastructure for Bitcoin Mining at its facilities in Rockdale, Texas (the “Rockdale Facility”), Navarro County, Texas (the “Corsicana Facility”)
- Riot Platforms, Inc. Form 10-Q for the quarter ended June 30, 2026 · Riot Platforms, Inc. (SEC Form 10-Q) · retrieved 2026-09-11
The Corsicana Facility is currently equipped to provide up to approximately 400 MW of developed capacity for Bitcoin Mining
- Riot Platforms, Inc. Form 10-Q for the quarter ended June 30, 2026 · Riot Platforms, Inc. (SEC Form 10-Q) · retrieved 2026-09-11
The Company owns and manages multiple large-scale data center facilities in Texas and Kentucky.
Samsung ElectronicsNot a compute operatorOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Austin
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- US Offices | Samsung Semiconductor Global · Samsung Electronics · retrieved 2026-09-11
At Samsung Austin Semiconductor, innovation, creativity and talent are driving success for a foundry focused on developing and producing world-class products to meet customer demands for technology that fuels our lives.
Samsung ElectronicsNot a compute operatorUnder constructionDocumented building outlineVerified 2026-09-04
- Locality
- Taylor
- First announced
- 2021-11-24
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Samsung Electronics Announces New Advanced Semiconductor Fab Site in Taylor, Texas – Samsung Global Newsroom · Samsung Electronics · retrieved 2026-09-04
Samsung Electronics, a world leader in advanced semiconductor technology, today announced that it would build a new semiconductor manufacturing facility in Taylor, Texas.
- Taylor | US Fab | Samsung Semiconductor Global · Samsung Electronics · retrieved 2026-09-04
The new facility we're building in Taylor, Texas is an extension of our ongoing commitment.
- Governor Abbott Announces New $17 Billion Samsung Manufacturing Facility in Taylor | Office of the Texas Governor | Greg Abbott · Office of the Texas Governor · retrieved 2026-09-04
Governor Greg Abbott today announced at a press conference in Austin that Samsung Electronics, Co., Ltd. ("Samsung") will build a new semiconductor manufacturing facility in Taylor.
- Samsung Austin Semiconductor | Taylor, TX - Official Website · City of Taylor, Texas · retrieved 2026-09-04
Even while we wait for construction to be complete and microchips shipped from its new Taylor plant, Samsung has invested tremendously into the Taylor community.
- Taylor | US Fab | Samsung Semiconductor Global · Samsung Electronics · retrieved 2026-09-05
The CHIPS investment would turn Samsung’s existing presence in Texas into a comprehensive ecosystem for the development and production of leading-edge, current generation, and mature node logic chips in the United States, including two new leading-edge logic fabs and research and development (R&D) in Taylor, as well as an expansion to the company’s existing Austin facility.
- Biden-Harris Administration Announces CHIPS Incentives Award with Samsung Electronics to Solidify U.S. Leadership in Leading-Edge Semiconductor Production | NIST · National Institute of Standards and Technology · retrieved 2026-09-05
This funding will support Samsung’s investment of over $37 billion in the coming years to turn its existing presence in Central Texas into a comprehensive ecosystem for the development and production of leading-edge chips in the United States, including two new leading-edge logic fabs and an R&D fab in Taylor, as well as an expansion to their existing Austin facility.
- Samsung Electronics Announces New Advanced Semiconductor Fab Site in Taylor, Texas – Samsung Global Newsroom · Samsung Electronics · retrieved 2026-09-05
The Taylor site will span more than 5 million square meters and is expected to serve as a key location for Samsung’s global semiconductor manufacturing capacity along with its latest new production line in Pyeongtaek, South Korea.
- Samsung Electronics Announces New Advanced Semiconductor Fab Site in Taylor, Texas – Samsung Global Newsroom · Samsung Electronics · retrieved 2026-09-05
The new facility will manufacture products based on advanced process technologies for application in areas such as mobile, 5G, high-performance computing (HPC) and artificial intelligence (AI).
- Samsung Electronics Announces New Advanced Semiconductor Fab Site in Taylor, Texas – Samsung Global Newsroom · Samsung Electronics · retrieved 2026-09-05
In particular, the proximity to Samsung’s current manufacturing site in Austin, about 25 kilometers southwest of Taylor, allows the two locations to share the necessary infrastructure and resources.
- Taylor | US Fab | Samsung Semiconductor Global · Samsung Electronics · retrieved 2026-09-05
Our Taylor campus is expected to directly create more than 1,800 high tech jobs within the next decade.

Skybox DatacentersColocationOperationalDocumented building outlineVerified 2026-09-02
- Published power
- 26 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Skybox Houston I | Skybox Datacenters · Skybox Datacenters · retrieved 2026-09-02
Skybox Houston One is a purpose-built, high-density designed mission critical data center
- Skybox Houston I | Skybox Datacenters · Skybox Datacenters · retrieved 2026-09-02
26 MW
- Skybox Houston I | Skybox Datacenters · Skybox Datacenters · retrieved 2026-09-02
Home to several of the worlds densest HPC compute environments
Stream Data CentersColocationOperationalStreet address, drawn as a pointVerified 2026-09-03
- Locality
- The Woodlands
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Data Centers Houston - The Woodlands, Texas | Stream Data Centers · Stream Data Centers · retrieved 2026-09-03
4001 Technology Forest Blvd The Woodlands, Texas 77381
- Data Centers Houston - The Woodlands, Texas | Stream Data Centers · Stream Data Centers · retrieved 2026-09-03
7.8+ MW of 2N critical load
- Data Centers Houston - The Woodlands, Texas | Stream Data Centers · Stream Data Centers · retrieved 2026-09-03
Having successfully maintained uptime and expert operations since 2013
Stream Data CentersColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- The Woodlands
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Data Centers Houston - The Woodlands, Texas | Stream Data Centers · Stream Data Centers · retrieved 2026-09-10
IAHA1 (aka Houston I) tenants benefit from the secure location, highly resilient infrastructure, ample connectivity options and nearby local amenities.
- Data Centers Houston - The Woodlands, Texas | Stream Data Centers · Stream Data Centers · retrieved 2026-09-10
Having successfully maintained uptime and expert operations since 2013
- Data Centers Houston - The Woodlands, Texas | Stream Data Centers · Stream Data Centers · retrieved 2026-09-10
beautiful campus in The Woodlands, Texas, just outside of Houston, is designed to support high performance compute, with 7.8+ MW of 2N critical load.
Stream Data CentersColocationUnder constructionDocumented building outlineVerified 2026-09-10
- Locality
- San Antonio
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Data Centers San Antonio | Texas Colocation · Stream Data Centers · retrieved 2026-09-10
Strategically located on West Military Drive and Loop 1604, the new West San Antonio campus will leverage a nationally competitive energy market while prioritizing sustainability and taking advantage of the latest in infrastructure design, enabling reliability, security, scalability, and uptime.
- Data Centers San Antonio | Texas Colocation · Stream Data Centers · retrieved 2026-09-10
The first facility on the new campus, SATB1 (a.k.a. San Antonio III), is fully-leased with 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.
- Data Centers San Antonio | Texas Colocation · Stream Data Centers · retrieved 2026-09-10
Three out of the new buildings, 120 MW, remain available for new tenant deployments.
SwitchColocationDocumented building outlineVerified 2026-09-02
- Locality
- Round Rock
- First announced
- 2021-06-02
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Switch Announces Fifth Prime Expansion with Development of Exascale Data Center Campus in Texas · Switch, Inc. · retrieved 2026-09-02
The land purchase agreement with Dell Technologies will allow Switch to construct over 1.5 million square feet of its highly resilient Tier 5
- Switch Announces Fifth Prime Expansion with Development of Exascale Data Center Campus in Texas · Switch, Inc. · retrieved 2026-09-02
global headquarters in Round Rock, Texas.
- Switch Announces Fifth Prime Expansion with Development of Exascale Data Center Campus in Texas · Switch, Inc. · retrieved 2026-09-02
Switch expects to begin site preparation and permitting at The Rock Campus in the summer of 2021.
- Austin Data Center | Texas Colocation | Switch · Switch, Inc. · retrieved 2026-09-02
The Rock is located in Austin, Texas at Dell Technologies global headquarters.
Texas Advanced Computing Center, The University of Texas at AustinPrivateOperationalStreet address, drawn as a pointVerified 2026-09-11
- Locality
- Austin
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
- Operation Frontera · Texas Advanced Computing Center (Texascale) · retrieved 2026-09-11
364,000 pounds of aluminum, steel, and silicon had already been rolled across the reinforced floor of the TACC data center tucked away on The University of Texas J.J. Pickle Research Campus in North Austin.
- Operation Frontera · Texas Advanced Computing Center (Texascale) · retrieved 2026-09-11
TACC upgraded the data center’s power and cooling systems for Frontera and reinforced the floors for its larger, heavier racks.
- Frontera · Texas Advanced Computing Center · retrieved 2026-09-11
Deployed in June 2019, early user access began in June 2019, and the system entered full production in September 2019.
- Contact | TACC · Texas Advanced Computing Center · retrieved 2026-09-11
TACC’s offices are located in the Advanced Computing Building (ACB, Building 205) and the Research Office Complex (ROC, Building 196) on the
TenstorrentNot a compute operatorOperationalNamed site, drawn as a pointVerified 2026-09-11
- Locality
- Austin
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Tenstorrent Selects Samsung Foundry to Manufacture Next-Generation AI Chiplet · Tenstorrent · retrieved 2026-09-11
Headquartered in Toronto, Canada, with U.S. offices in Austin, Texas, and Silicon Valley, and global offices in Belgrade, Tokyo, and Bangalore, Tenstorrent brings together experts in the field of computer architecture, ASIC design, advanced systems, and neural network compilers.
- Tenstorrent (company page, our locations) · Tenstorrent · retrieved 2026-09-11
Austin 7717 Southwest Pkwy Building #3, Suite 200 Austin, TX 78735
TeslaNot a compute operatorOperationalDocumented building outlineVerified 2026-09-11
- Locality
- Austin
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Tesla, Inc. Form 10-K for fiscal year 2025 · Tesla, Inc. · retrieved 2026-09-11
We are headquartered in Austin, Texas.
TeslaPrivateOperationalDocumented building outlineVerified 2026-09-02
- Locality
- Austin
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
- Tesla Q4 and FY 2024 Update (shareholder deck), Core Technology, page 10 · Tesla, Inc. · retrieved 2026-09-02
In Q4, we completed the deployment of Cortex, a ~50k H100 training cluster at Gigafactory Texas.
Thin-nologyColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- Pflugerville
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Data Center | Thin-nology · Thin-nology · retrieved 2026-09-10
We operate a fully compliant Tier III Data Center in North Austin.
- Colocation Services | Thin-nology · Thin-nology · retrieved 2026-09-10
Our colocation facility is a Tier III design.
- Data Center | Thin-nology · Thin-nology · retrieved 2026-09-10
We provide a HIPPA, PCI-DSS, Gramm-Leach, Sarbanes-Oxley compliant facility with all the redundancy and security you would expect from a full-service Tier III facility.
TierPointColocationOperationalDocumented building outlineVerified 2026-09-03
- Locality
- Allen
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Dallas-Allen Data Center | TierPoint · TierPoint · retrieved 2026-09-03
820 Allen Commerce Parkway
- Dallas-Allen Data Center | TierPoint · TierPoint · retrieved 2026-09-03
Dallas (Allen) data center and colocation facility is certified for design and construction by the Uptime Institute
- Dallas-Allen Data Center | TierPoint · TierPoint · retrieved 2026-09-03
29,000+ total square feet, 16,000+ square feet of raised floor space
Vantage Data CentersColocationDocumented building outlineVerified 2026-09-11
- Locality
- San Antonio
- Published power
- 32 MW
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Architectural Barriers Project Details, TABS2024007561, Data Center Building TX11 · Texas Department of Licensing and Regulation · retrieved 2026-09-11
TX11 is a 2 story data center building with a total of 32MW capacity.
- Architectural Barriers Project Details, TABS2024007561, Data Center Building TX11 · Texas Department of Licensing and Regulation · retrieved 2026-09-11
14720 Omicron Dr. San Antonio, TX 78245
- Architectural Barriers Project Details, TABS2024007561, Data Center Building TX11 · Texas Department of Licensing and Regulation · retrieved 2026-09-11
Owner Name: VANTAGE DATA CENTERS TX1 LLC
Vantage Data CentersColocationUnder constructionDocumented building outlineVerified 2026-09-10
- Locality
- San Antonio
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Architectural Barriers Project Details, TABS2026001234, VANTAGE DATA CENTER (TX12) · Texas Department of Licensing and Regulation · retrieved 2026-09-10
TX12 is a new vantage data center at TX1 campus consisting of 2-story building with up to 96MW of critical IT capacity.
- Architectural Barriers Project Details, TABS2026001234, VANTAGE DATA CENTER (TX12) · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Facility Name: TX12 Location Address: 17420 Omicron Dr San Antonio, TX 78245 Location County: Bexar
- Architectural Barriers Project Details, TABS2026001234, VANTAGE DATA CENTER (TX12) · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Owner Name: VANTAGE DATA CENTERS TX1 LLC
- Architectural Barriers Project Details, TABS2026001234, VANTAGE DATA CENTER (TX12) · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Start Date: 10/14/2025 Completion Date: 8/31/2027 Estimated Cost: $276,878,327 Type of Work: New Construction
- Architectural Barriers Project Details, TABS2026012091, TX12 TFO · Texas Department of Licensing and Regulation · retrieved 2026-09-10
TX12 Opel Fit-up includes the tenant build out of 96MW of data modules and all associated office and storage areas.
Vantage Data CentersColocationOperationalDocumented building outlineVerified 2026-09-10
- Locality
- San Antonio
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- Architectural Barriers Project Details, TABS2024005974, Vantage Data Centers TX21 Core and Shell +16MW Fit-Out · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Facility Name: VDC TX21 Location Address: 5207 Rogers Road San Antonio, TX 78251 Location County: Bexar
- Architectural Barriers Project Details, TABS2024005974, Vantage Data Centers TX21 Core and Shell +16MW Fit-Out · Texas Department of Licensing and Regulation · retrieved 2026-09-10
3-story Data Center, This phase has 2 levels of shell for future data halls and 1 level of data center space with service yards and various support spaces.
- Architectural Barriers Project Details, TABS2024005974, Vantage Data Centers TX21 Core and Shell +16MW Fit-Out · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Start Date: 12/11/2023 Completion Date: 6/1/2025 Estimated Cost: $157,000,000 Type of Work: New Construction
- Architectural Barriers Project Details, TABS2026006358, Vantage Data Centers TX21 Tenant Fit-out · Texas Department of Licensing and Regulation · retrieved 2026-09-10
Project Name: Vantage Data Centers TX21 Tenant Fit-out Project Number: TABS2026006358 Facility Name: VDC TX21 Location Address: 5207 ROGERS ROAD San Antonio, TX 78251
- Central Registry Regulated Entity RN111926465, VANTAGE DATA CENTER TX2 · Texas Commission on Environmental Quality · retrieved 2026-09-10
Name: VANTAGE DATA CENTER TX2 Primary Business: No primary business description on file. Street Address: 5207 ROGERS RD, SAN ANTONIO TX 78251 3632
- Central Registry Regulated Entity RN111926465, VANTAGE DATA CENTER TX2 · Texas Commission on Environmental Quality · retrieved 2026-09-10
CN606236008 VANTAGE DATA CENTERS TX21 LLC OWNER OPERATOR
- Central Registry Regulated Entity RN111926465, VANTAGE DATA CENTER TX2 · Texas Commission on Environmental Quality · retrieved 2026-09-10
518210 NAICS Data Processing, Hosting, and Related Services
WistronNot a compute operatorOperationalNamed site, drawn as a pointVerified 2026-09-11
- Locality
- Fort Worth
This operator does not sell compute. The site makes the hardware the prices on GPUQuant are about, rather than renting any of it out.
- Wistron · Wistron · retrieved 2026-09-11
The new Fort Worth facility strengthens a critical upstream layer of the AI infrastructure supply chain by expanding domestic capacity to assemble and test NVIDIA AI systems.
- NVIDIA, Wistron Kick Off AI Supercomputer Factories in Fort Worth · Dallas Innovates · retrieved 2026-09-11
Last summer, Wistron purchased two properties in Fort Worth to build and test NVIDIA AI supercomputers: the 766,994-square-foot Westport 14 at 14601 Mobility Way from Hillwood, and a 324,598-square-foot building from Trammell Crow Co., 35 Eagle at 15200 Heritage Pkwy.
- Wistron · Wistron · retrieved 2026-09-11
Approved an additional capital expenditure of up to USD 49.9 million for Wistron InfoComm (USA) Corporation (WUS), a wholly owned subsidiary of the Company, in connection with the future business development of the Eagle plant in Texas.
Building outlines © OpenStreetMap contributors, ODbL. Facility locations from the U.S. EPA Facility Registry Service. Licence