Digital Edge PUS1
Digital EdgeColocationOperationalStreet address, drawn as a pointVerified 2026-09-02
- Place
- Busan
- Locality
- Busan
- Geometry
- Point source
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
- South Korea Data Centers in Seoul and Busan | Digital Edge · Digital Edge · retrieved 2026-09-03
Korea’s only data center with integrated Cable Landing Station. 1,605 cabinets, 14MW.
- South Korea Data Centers in Seoul and Busan | Digital Edge · Digital Edge · retrieved 2026-09-03
Centum City, Busan. Integrated Cable Landing Station
- South Korea Data Centers in Seoul and Busan | Digital Edge · Digital Edge · retrieved 2026-09-03
SOC 2 Type II
- PUS1 Busan facility specification sheet, November 2024 · Digital Edge · retrieved 2026-09-03
32 Centum 7-ro, Haeundae-gu
- PUS1 Busan facility specification sheet, November 2024, SPACE table · Digital Edge · retrieved 2026-09-03
3-story, purpose-built, multi-tenant