xAI / Southaven / Mississippi / US
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Tennessee Valley Authority and Midcontinent Independent Transmission System Operator, Inc...
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Who xAI buys from and sells to, each relationship carrying the source that states it.
Supplies 4U liquid-cooled servers containing NVIDIA Hopper GPUs for the Colossus cluster
xAI's Colossus supercomputer cluster achieves remarkable scale by utilizing Supermicro 4U liquid cooled servers containing NVIDIA Hopper Tensor Core GPUs.
How Supermicro Built the xAI Colossus Supercomputer · Supermicro · read 2026-09-06
Supplies NVIDIA Hopper GPUs for the Colossus cluster, a combined total of 200,000
xAI is in the process of doubling the size of Colossus to a combined total of 200,000 NVIDIA Hopper GPUs.
NVIDIA Ethernet Networking Accelerates World's Largest AI Supercomputer, Built by xAI · NVIDIA · read 2026-09-06
Supplies OCI AI infrastructure to train and run inferencing for the Grok models
xAI will also leverage the scalability, performance, and cost efficiency of OCI's leading AI infrastructure to train and run inferencing for its next-generation Grok models.
xAI's Grok Models are Now on Oracle Cloud Infrastructure · Oracle · read 2026-09-06
None recorded.
Every company xAI deals with, and its own other sites, are on the xAI page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
We have entered into an agreed order with the Mississippi Department of Environmental Quality establishing a fixed removal timeline for all 69 of the temporary, mobile turbines that currently power our facility in Southaven, Mississippi.
The 1.2 GW permanent power plant currently under construction will consist of 41 permanent turbines authorized under a Clean Air Act permit, granted to SpaceXAI in March 2026.
SpaceX announced today that it has acquired xAI.
xAI has purchased and is retrofitting a building to house the new data center operations.
The data center, which will be known as MACROHARDRR, is in proximity to xAI’s newly acquired power plant site in Southaven and one of the company’s existing data centers in Tennessee.
The company expects to begin data center operations in Southaven in February 2026.
Recently, xAI announced the purchase of the building formerly used by GXO at 2400 Stateline Road as expansion plans continue in Southaven.
The newest data center will be home to GB 300 processing units for artificial intelligence operations and is expected to bring new job counts in excess of 100 immediately.
According to property records, MZX Tech, an LLC associated with xAI, purchased the property on Dec. 23.
The property at 2400 Stateline Road is a short drive from xAI’s natural gas power plant that the company bought in July 2025.
The location will be on Stateline Road in Southaven, across from the existing power center on Stanton Road.