xAI / Memphis / Tennessee / US
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
B200, B300 · 1,111,673 H100e · 946 MW, estimated
Used by Anthropic, Cursor, SpaceXAI
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Tennessee Valley Authority and Midcontinent Independent Transmission System Operator, Inc...
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Who xAI buys from and sells to, each relationship carrying the source that states it.
Supplies 4U liquid-cooled servers containing NVIDIA Hopper GPUs for the Colossus cluster
xAI's Colossus supercomputer cluster achieves remarkable scale by utilizing Supermicro 4U liquid cooled servers containing NVIDIA Hopper Tensor Core GPUs.
How Supermicro Built the xAI Colossus Supercomputer · Supermicro · read 2026-09-06
Supplies NVIDIA Hopper GPUs for the Colossus cluster, a combined total of 200,000
xAI is in the process of doubling the size of Colossus to a combined total of 200,000 NVIDIA Hopper GPUs.
NVIDIA Ethernet Networking Accelerates World's Largest AI Supercomputer, Built by xAI · NVIDIA · read 2026-09-06
Supplies OCI AI infrastructure to train and run inferencing for the Grok models
xAI will also leverage the scalability, performance, and cost efficiency of OCI's leading AI infrastructure to train and run inferencing for its next-generation Grok models.
xAI's Grok Models are Now on Oracle Cloud Infrastructure · Oracle · read 2026-09-06
None recorded.
Every company xAI deals with, and its own other sites, are on the xAI page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
SpaceXAI is building the world's largest integrated supercomputer at the Tennessee-Mississippi state line.
SpaceX announced today that it has acquired xAI.
The turbines, which will be installed at a former Duke Energy power plant site in Southaven, will be used to power xAI’s Colossus 2 data center, located a few hundred meters from Tulane Road, across the state boundary in the Whitehaven district of Memphis.
and the data center came online in January.
In addition, xAI owns a second large property on Tulane Road and has stated that its energy needs for that site exceed 1,000 megawatts.
xAI’s consultants submitted an air modeling protocol to EPA for an installation of 40 to 90 combustion turbines at the Tulane Road site.
After acquiring their second facility just north of the Mississippi state line, property in Southaven’s industrial zone became ideal for further expansion.
The company has two data centers — Colossus 1 and Colossus 2 — in Memphis, Tennessee, just across the Mississippi state line.
Elon Musk’s xAI filed a $659 million permit for expansion to its Colossus 2 site on Tulane Road.
Have a correction to this record? Include a source so a maintainer can review it.