xAI / Memphis / Tennessee / US
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
230,000 chips · NVIDIA H100 SXM5 80GB · 275,796 H100e · 352 MW, estimated · since 2025-07
Used by xAI
H100, H200, B200 · 275,796 H100e · 340 MW, estimated
Used by Anthropic
200,000 chips · NVIDIA H100 SXM5 80GB · 200,000 H100e · 280 MW, estimated · since 2025-02
Used by xAI
100,000 chips · NVIDIA H100 SXM5 80GB · 100,000 H100e · 150 MW · since 2024-09
Used by xAI
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Tennessee Valley Authority and Midcontinent Independent Transmission System Operator, Inc...
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Who xAI buys from and sells to, each relationship carrying the source that states it.
Supplies 4U liquid-cooled servers containing NVIDIA Hopper GPUs for the Colossus cluster
xAI's Colossus supercomputer cluster achieves remarkable scale by utilizing Supermicro 4U liquid cooled servers containing NVIDIA Hopper Tensor Core GPUs.
How Supermicro Built the xAI Colossus Supercomputer · Supermicro · read 2026-09-06
Supplies NVIDIA Hopper GPUs for the Colossus cluster, a combined total of 200,000
xAI is in the process of doubling the size of Colossus to a combined total of 200,000 NVIDIA Hopper GPUs.
NVIDIA Ethernet Networking Accelerates World's Largest AI Supercomputer, Built by xAI · NVIDIA · read 2026-09-06
Supplies OCI AI infrastructure to train and run inferencing for the Grok models
xAI will also leverage the scalability, performance, and cost efficiency of OCI's leading AI infrastructure to train and run inferencing for its next-generation Grok models.
xAI's Grok Models are Now on Oracle Cloud Infrastructure · Oracle · read 2026-09-06
None recorded.
Every company xAI deals with, and its own other sites, are on the xAI page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Memphis is home to Colossus, a state-of-the-art supercomputer that is also the computing power behind Grok – SpaceXAI’s revolutionary AI companion. By 2026, SpaceXAI plans to equip this facility with 1 million GPUs (special computer chips) to enhance the speed and intelligence of our AI systems.
SpaceXAI transformed a vacant 1-million-square-foot factory in Southwest Memphis into a cutting-edge technology hub.
Utilizing existing infrastructure in the former Electrolux facility, already zoned for our use.
We have provided tens of millions of dollars in local tax revenue since we arrived in Memphis in March 2024.
At our Electrolux site we have on-site energy storage (over 240 batteries) and 15 permitted natural gas generators with best-in-class emissions control technologies that will serve as back-up power in emergencies, or when the local grid is strained during times of deep cold or heat.
Built in 122 days — outpacing every estimate — Colossus was the most powerful AI training system yet. Then we doubled it in 92 days to 200k GPUs. This is just the beginning.
H100 GPUs in a single interconnected cluster
Doubled to 200K GPUs.
New: Anthropic partners with Colossus
SpaceX announced today that it has acquired xAI.
COLOSSUS DATA CENTER
COLOSSUS DATA CENTER - CTC PROPERTY LLC
3231 PAUL R LOWRY RD
xAI’s Gigafactory of Compute – the World’s largest supercomputer – would be located in Memphis, Tennessee.
In a landmark announcement at the Greater Memphis Chamber Annual Chairman’s Luncheon, xAI revealed plans for an expansion of its “Colossus” supercomputer facility.
"AIRStatus":"Operating"
"AIRName":"COLOSSUS DATA CENTER"
In 2024, the world’s largest supercomputer, Colossus, became operational on President’s Island in Memphis, Tennessee.
Beginning in early June 2024, CTC began installing and, thereafter, operating numerous gas turbines at its facility in Southwest Memphis without obtaining any air permit or other written approval from the Health Department.