Microsoft / Clondalkin / County Dublin / US
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
This Environmental Impact Assessment Report (EIAR) has been prepared on behalf of Microsoft (MS) Ireland Operations Ltd. to accompany an application to South Dublin County Council (SDCC) for the construction of 2 data centres (DUB 14 & DUB15) along with a Central Office Administration Building as an extension to the existing Microsoft Data Centre Campus at Grange Castle International Business Park, Clondalkin, Co Dublin.
Construction of a single 1- 4 storey Central Administration Building and 2 no. 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS Campus.
The proposed development will have a maximum operational electrical demand of 60MW for each data centre.
Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus
Grant Extension of Duration of Permission
Building outlines © OpenStreetMap contributors, ODbL. Licence