Crusoe / Abilene / Texas / US
Abilene, Texas, US
A source naming a city gives a city-precision record and no outline. Inferring one from a satellite image would be fabrication with a map legend on it.
A power or accelerator figure appears above only where an operator or a filing states it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Who Crusoe buys from and sells to, each relationship carrying the source that states it.
Supplies LM2500XPRESS aeroderivative gas turbine packages
GE Vernova Inc. (NYSE: GEV) and Crusoe, the industry’s first vertically integrated AI infrastructure provider, today announced a significant deal to deliver 29 units of GE Vernova’s breakthrough LM2500XPRESS aeroderivative gas turbine packages to Crusoe AI data centers.
GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal to deliver power to AI data centers · GE Vernova · read 2026-09-11
Supplies LM2500XPRESS aeroderivative gas turbine packages for Crusoe AI data centers
ATLANTA (July 22, 2025) - GE Vernova Inc. (NYSE: GEV) and Crusoe, the industry’s first vertically integrated AI infrastructure provider, today announced a significant deal to deliver 29 units of GE Vernova’s breakthrough LM2500XPRESS aeroderivative gas turbine packages to Crusoe AI data centers.
GE Vernova and Crusoe announce major 29-unit aeroderivative gas turbine deal to deliver power to AI data centers · GE Vernova · read 2026-09-11
Buys A 900 MW site supporting large-scale AI workloads for Microsoft
Supporting large scale AI workloads for Microsoft, the 900 MW site includes two new buildings and an onsite power plant to support grid resilience.
Crusoe builds 900 MW Abilene campus for Microsoft | Crusoe · Crusoe · read 2026-09-11
Buys Datacenter capacity at a 900 MW site for AI workloads
Supporting large scale AI workloads for Microsoft, the 900 MW site includes two new buildings and an onsite power plant to support grid resilience.
Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure · Crusoe · read 2026-09-11
Buys The 1.2 GW Abilene, Texas AI campus, purpose built for Oracle
At its flagship 1.2 GW Abilene, Texas campus – purpose built for Oracle - the first two buildings are operational and an additional six buildings are under construction.
Crusoe's contracted AI infrastructure nears 5 GW · Crusoe · read 2026-09-11
Buys The 1.2 GW Abilene, Texas campus purpose built for Oracle
At its flagship 1.2 GW Abilene, Texas campus – purpose built for Oracle - the first two buildings are operational and an additional six buildings are under construction.
Crusoe's contracted AI infrastructure nears 5 GW | Crusoe · Crusoe · read 2026-09-11
Every company Crusoe deals with, and its own other sites, are on the Crusoe page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Crusoe, the AI factory company, today announced the development of a new, dedicated AI factory campus in Abilene, Texas.
Supporting large scale AI workloads for Microsoft, the 900 MW site includes two new buildings and an onsite power plant to support grid resilience.
The new campus is located adjacent to Crusoe's existing Abilene AI factory infrastructure, bringing the total projected capacity across the full Abilene site to 2.1 gigawatts (GW).
Land clearing and site preparation for the new campus are already underway, with the first building expected to be energized in mid-2027