University of Minnesota (Minnesota Supercomputing Institute) / Minneapolis / Minnesota / US
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
264 chips · NVIDIA A100 SXM4 40 GB · 83 H100e · 0 MW, estimated · since 2021-11
Used by Academia, Researchers
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Midcontinent Independent Transmission System Operator, Inc...
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
The Agate cluster will join existing systems in MSI's data center at the University of Minnesota's Walter Library
Delivery is expected to begin in mid-October 2021, with the cluster available to Minnesota researchers by the end of 2021.