Sabey Data Centers / Tukwila / Washington / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Puget Sound Energy, Seattle City Light and Bonneville Power Administration.
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Seattle Data Center is our flagship data center campus.
Comprised of over a million square feet of space, our Seattle data center is ideal for your colocation or powered shell deployment.
3355 35th Ave S
Over 90 MVA of aggregate power delivered to the campus through redundant feeds, with additional power available from a third feed
Sabey Data Center Properties 12201 Tukwila International Blvd., 4th Floor Seattle, WA 98168
3355 S 120TH PL