Loading benchmark data
Retelit / Milan / Lombardia / IT
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2025, from the source named under them.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Avalon 3 is built just over 4 km away from the data rooms of Avalon 1 in via Caldera to which it is connected via a large number of optical fibers on different physical paths.
within the Municipality of Milan in the area with the highest density of Data Centers and optical fibers
3.2 MW of IT power
Single-member company subject to the management and coordination of Retelit S.p.A.
Have a correction to this record? Include a source so a maintainer can review it.