QScale / Lévis / Quebec / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
2280 Albert-Dion St,
We build and operate high-density AI colocation facilities designed for large-scale training and inference.
114 MW of protected customer IT load
Q01 is an AI data center campus built for the future of high-density computing.
QScale’s Q01 Campus enabled Hewlett Packard Enterprise (HPE) to deploy its AI Cloud solution on time and within budget, achieving more than 20% reduction in energy consumption and a PUE of less than 1.2.
LÉVIS, Quebec — June 4, 2026 — QScale, a leading Canadian developer and operator of next-generation, AI-ready data centers, today announced that construction of its second building (Q01‑Building‑B) at its flagship Q01 Campus in Lévis is now well underway.
Building outlines © OpenStreetMap contributors, ODbL. Licence