Oak Ridge National Laboratory / Oak Ridge / Tennessee / US
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
37,632 chips · AMD Radeon Instinct MI250X · 7,283 H100e · 40 MW · since 2022-05
Used by US Government, Academia, Industry
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Tennessee Valley Authority.
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
The Oak Ridge Leadership Computing Facility at Oak Ridge National Laboratory (ORNL) is home to America’s first exascale system, the 2 exaflops HPE Cray EX Frontier supercomputer.
The Frontier supercomputer at the Department of Energy’s Oak Ridge National Laboratory earned the top ranking today as the world’s fastest on the 59th TOP500 list
Oak Ridge Leadership Computing Facility One Bethel Valley Rd