Oppidan / Hilliard / Ohio / US
Whether this operator sells GPU-hours is not established, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
Whether this operator sells GPU-hours is not established, so no price on GPUQuant refers to it.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
the sanitary sewer public improvements constructed at the Oppidan Data Center at 4861 Edwards Farms Road be accepted as public improvements
WHEREAS, Oppidan, (the "Developer"), owns 14.95± acres (the "Property") located on the west side of Edwards Farms Road, identified as tax parcel identification number 050-011895; and
WHEREAS, as part of the Site Plan, the Developer is required to extend a public sanitary sewer 178 feet to serve the data center building; and
The southern portion of the parent tract was approved in September 2022 for the development of an 89,954-square-foot data center that is currently under construction.
Building outlines © OpenStreetMap contributors, ODbL. Licence