National Center for High-performance Computing / Xinshi District, Tainan City / Tainan City / US
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
Xinshi District, Tainan City, Tainan City, US
GPUQuant draws an outline only where a documented building outline is recorded, so nothing is drawn here.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
兩國元首實地視察了「國網雲端算力中心」。
此中心作為國家「AI 新十大建設」的核心數位基石,具備 15MW 超高電力容量,並結合尖端防震、節能技術與多重備援系統;它不僅是供應國家級運算需求的動力源,更是強化全臺資料網路韌性、確保主權資訊安全的戰略堡壘。
744094 臺南市新市區南科三路20號
參訪期間巴拉圭總統貝尼亞特別在國網雲端算力中心三樓「晶創機房」外的牆面簽名留言。
220台NVIDIA H200節點,每節點配備雙Intel Xeon Platinum處理器與8張NVIDIA H200 GPU,記憶體容量達2TB。
2座NVIDIA GB200 NVL72,每座配備72顆NVIDIA Grace處理器與72顆Blackwell GPU,記憶體容量達13.5TB。