Loading benchmark data
Nabiax / Alcalá de Henares / Comunidad de Madrid / ES
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2025, from the source named under them.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
El campus de Alcalá Data Center está ubicado cerca del aeropuerto de Madrid-Barajas (España). Con sus dos primeras fases construidas, cuenta con 22,3 MW de potencia IT actualmente, que puede alcanzar los 100 MW en el medio plazo, lo que lo convierte en el más grande del país.
Avenida Punto Com, 23 28805 Alcalá de Henares, Madrid
Nabiax renueva la Certificación Tier IV Gold de Sostenibilidad Operativa de Uptime Institute en el data center de Alcalá de Henares
ADC es la referencia nacional para los hiperescalares
Alcalá Data Center Campus is located nearby the Madrid-Barajas Airport (Spain). Having its two first phases built, it delivers 22,3 MW IT Power, scalable to 100 MW in the medium term, thus being the biggest Data Center in Spain.
ADC is the reference for hyperscalers in the country, with more than 10,000 sqm of IT space built in a 100% Carrier Neutral environment.
Have a correction to this record? Include a source so a maintainer can review it.