Middletown Data Center / Middletown / Virginia / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to PJM Interconnection, LLC.
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Address: 8209 Valley Pike
The data center provides 10MW of critical IT load with over 43,400 square feet of raised floor data center space, over 6 data halls.
A Colocation and Wholesale Data Center Designed to Meet all your Compute Needs
Recently renovated in 2022 with the latest technology and IT infrastructure.
14MW Total Power (10MW critical IT load)
Have a correction to this record? Include a source so a maintainer can review it.