Lincoln Property Company / Plano / Texas / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
10,752 chips · NVIDIA H100 SXM5 80GB · 10,752 H100e · 16 MW, estimated · since 2023-11
Used by NVIDIA, CoreWeave
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Electric Reliability Council of Texas, Inc..
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Data Center Fit Up of existing shell space, 9,419 sf total, within the Coit Road Data Center including supporting infrastructure and site improvements.
inside existing facility to support 18MW of critical data hall load
The second machine bearing the Eos name, as we have all come to find out thanks to our error, is called Eos-DFW, and it is installed at a CoreWeave datacenter in the Dallas-Fort Worth area.