LG CNS / Hanam-si / Gyeonggi-do / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
Hanam Data Center
Hanam Data Center is a hyperscale / colocation data center located in Hanam-si with a total capacity of 40MW and a target IT load of 25.44MW
The main tenant has signed (i) rent agreements to collectively rent the entire space within Hanam Data Center and (ii) data center use agreements with the actual users of Hanam Data Center, which correspond to space rented in respective rent agreement.
Pungsan-dong, Hanam-si, Gyeonggi-do, Korea
시공은 삼성물산이 담당하며 데이터센터 설계·관리·운영은 LG CNS가 맡았다.
이지스운용은 지난 2021년 대규모 데이터센터 개발을 위해 하남시 미사 3동 607-2 인근 대지면적 6637㎡(2007.8평) 부지에 총사업비 3500억원을 투입, 지하 2층~지상 10층 연면적 41901.64㎡(1만2675.2평) 규모로 IT 부하용량 25.44MW, 총 용량 40MW다.