Loading benchmark data
Gulf Data Hub / Abu Dhabi / Abu Dhabi / AE
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2024, from the source named under them.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Four Data Centers will be developed in Abu Dhabi, in ICAD and KIZAD with a capacity of 16 MW each, ICAD 1 is operational since 2022.
Four Data Centers will be developed in Abu Dhabi, in ICAD and KIZAD with a capacity of 16 MW each, ICAD 1 is operational since 2022.
Providing wholesale data center space, to store companies’ mission critical equipment, rather than building their own, with perpetual updates to our technologies to exploit the power of cutting-edge advances in data hosting.
Gulf Data Hub ICAD 1
Have a correction to this record? Include a source so a maintainer can review it.