Fort Rock Data Center / Bend / Oregon / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to PacifiCorp - West and Bonneville Power Administration.
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
207 SW Columbia St.
Bend, OR, 97702
Secure, carrier-neutral infrastructure with redundant power, cooling, and connectivity—designed to keep critical data protected, available, and performing reliably.
Have a correction to this record? Include a source so a maintainer can review it.