Edged US / Aurora / Illinois / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to PJM Interconnection, LLC and Midcontinent Independent Transmission System Operator, Inc...
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Edged CHICAGO Data Center
2835 Bilter Road, Aurora, IL 60502
Edged Chicago is a 65+ acre high-tech campus strategically located in a key U.S. market with high-speed connections nationwide.
The first facility on the Edged Chicago campus opened in February 2025.
Strategically located at 2835 Bilter Road in Aurora, the second largest city in Illinois and a growing technology hub in the Chicagoland region, the facility is purpose-built to support high-density AI training and inference workloads.
Edged US builds and operates ultra-efficient, AI-ready facilities for major hyperscale cloud companies, technology providers and large enterprises.
*ORD01-2 and ORD01-3 may be merged into a single facility.
Have a correction to this record? Include a source so a maintainer can review it.