Eclairion / Bruyères-le-Châtel / Île-de-France / FR
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Bruyères-le-Châtel, Île-de-France, FR
A source naming a city gives a city-precision record and no outline. Inferring one from a satellite image would be fabrication with a map legend on it.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2025, from the source named under them.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
35 km south of Paris, this 4-hectare site has been operational since 2025, with a first phase of 60 MW dedicated to hosting high-density clusters.
Located in Essonne, at Bruyères-le-Châtel, Éclairion's first operational site benefits from an exceptionally strategic location
Dedicated to the colocation hosting of high-density computers and artificial intelligence clusters.
Launched last year and owned by High Performance Capital (HPC Group), Eclairion’s colo data center is set on a four-hectare site at Bruyères-le-Châtel, in the Essonne region outside Paris.
French modular data center operator Eclairion has raised €50 million ($52m) and revealed it is hosting AI lab Mistral’s new training cluster.
It has not been disclosed how much space Mistral is taking at the Eclairion data center, or what sort of hardware it will be deploying
Situé dans le parc du château, ce temple du calcul, de l’intelligence artificielle, de la simulation numérique et du big data, a pour slogan : « Calculer plus vite pour un monde meilleur ».
Elle sera organisée en quatre villages distincts de 2 500 m² capables d’accueillir des modules containers contenant les calculateurs haute densité.
Have a correction to this record? Include a source so a maintainer can review it.