Eclairion / Bruyères-le-Châtel / Île-de-France / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
Bruyères-le-Châtel, Île-de-France, US
A source naming a city gives a city-precision record and no outline. Inferring one from a satellite image would be fabrication with a map legend on it.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
35 km south of Paris, this 4-hectare site has been operational since 2025, with a first phase of 60 MW dedicated to hosting high-density clusters.
Located in Essonne, at Bruyères-le-Châtel, Éclairion's first operational site benefits from an exceptionally strategic location
Dedicated to the colocation hosting of high-density computers and artificial intelligence clusters.
Launched last year and owned by High Performance Capital (HPC Group), Eclairion’s colo data center is set on a four-hectare site at Bruyères-le-Châtel, in the Essonne region outside Paris.
French modular data center operator Eclairion has raised €50 million ($52m) and revealed it is hosting AI lab Mistral’s new training cluster.
It has not been disclosed how much space Mistral is taking at the Eclairion data center, or what sort of hardware it will be deploying
Situé dans le parc du château, ce temple du calcul, de l’intelligence artificielle, de la simulation numérique et du big data, a pour slogan : « Calculer plus vite pour un monde meilleur ».
Elle sera organisée en quatre villages distincts de 2 500 m² capables d’accueillir des modules containers contenant les calculateurs haute densité.