Loading benchmark data
Digital Edge / Incheon / Incheon / KR
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Incheon, Incheon, KR
A source naming a city gives a city-precision record and no outline. Inferring one from a satellite image would be fabrication with a map legend on it.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
11 other sites on this map. The nearest 8.
All 12 are listed on the Digital Edge page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Bupyeong-gu, Incheon. 25km from Seoul CBD, expressway access, 45min from Incheon Airport.
96MW campus scale, AI-ready infrastructure, business hub access, first DC green loan in South Korea. SEL2 Ready | SEL3 Ready: Q4 2027
largest commercial data center campus. 96MW total. SEL2: 36MW AI-ready with 10kVA density. SEL3: 60MW.