Core Scientific / Muskogee / Oklahoma / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Southwest Power Pool and Southwestern Power Administration.
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Who Core Scientific buys from and sells to, each relationship carrying the source that states it.
None recorded.
Buys contracted HPC datacenter infrastructure
The agreement increases CoreWeave’s total contracted HPC infrastructure with Core Scientific to approximately 590 MW across six sites.
Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site :: Core Scientific, Inc. (CORZ) · Core Scientific, Inc. · read 2026-09-11
Buys Leased power capacity
Through the exercise of several contractual options during 2024 and into early 2025, total leased customer power capacity under the relationship with CoreWeave increased to approximately 590 MW of leased power capacity.
Core Scientific, Inc. Form 10-K for fiscal year 2025 · Core Scientific, Inc. · read 2026-09-11
Every company Core Scientific deals with, and its own other sites, are on the Core Scientific page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
The 100 MW Muskogee data center will provide approximately 70 MW of critical IT load to power the latest generation of NVIDIA GPUs, with the remaining 30 MW powering ancillary systems required to ensure optimal GPU performance.
Next, at our Muskogee, Oklahoma campus, Phase 1, a 70 megawatt, 138,000 square foot data center has completed vertical construction and is now fully energized and has advanced into commissioning, remaining on track for full delivery in the second quarter.
1525 West Smith Ferry Road, Muskogee OK 74401
The facility is a data center that engages in processing and storing data and application on servers.
The 100-megawatt facility will host CoreWeave’s NVIDIA GPUs for an undisclosed client.