CloudHQ / Manassas / Virginia / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to PJM Interconnection, LLC.
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
38.71955, -77.49819
on the south side of the Manassas data center market
Providing over 375 MWs of critical IT load spread across seven data centers, the campus has provided ample growth opportunities for its tenants.
382 MWs Total Critical IT Load
MCC5 is siteplan approved and ready to begin immediate development.
Have a correction to this record? Include a source so a maintainer can review it.