Cipher Digital / Colorado City / Texas / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Colorado City, Texas, US
A source naming a city gives a city-precision record and no outline. Inferring one from a satellite image would be fabrication with a map legend on it.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Who Cipher Mining buys from and sells to, each relationship carrying the source that states it.
Supplies electricity for the Odessa Facility under a power purchase agreement (via Luminant)
In June 2021, we entered into a power purchase agreement with Luminant for the supply of electric power to the Odessa Facility, which was subsequently amended and restated, most recently on August 23, 2023 (as amended, the “Luminant Power Agreement”), pursuant to which we have access, until at least July 2027, to a cost of electricity of approximately 2.7 c/kWh, subject to certain increases related to certain tariffs, price increased in October 2025 to 2.8 c/kWh.
cifr-20251231 · Cipher Digital Inc. (formerly Cipher Mining Inc.) · read 2026-09-11
Buys 15-year lease of turnkey space and power for AI workloads
Cipher today announced an approximately $5.5 billion, 15-year lease agreement with Amazon Web Services to provide turnkey space and power for AI workloads.
nov3_earningspressreleasex · Cipher Mining Inc. · read 2026-09-11
Buys A 15-year lease of turnkey space and power for AI workloads
Cipher today announced an approximately $5.5 billion, 15-year lease agreement with Amazon Web Services to provide turnkey space and power for AI workloads.
Cipher Mining Provides Third Quarter 2025 Business Update (Form 8-K Exhibit 99.1) · Cipher Mining Inc. · read 2026-09-11
Buys Datacenter facility lease at Barber Lake for HPC
On September 24, 2025, the Company’s subsidiary Cipher Barber Lake LLC (“Cipher Barber Lake”) entered into a lease with Fluidstack USA II (“Fluidstack”) which provides for the development of a data center facility on, and lease of the Barber Lake Facility (the “Barber Lake Facility Lease”) for HPC.
Cipher Mining Inc. Form 10-Q for the quarter ended September 30, 2025 · Cipher Mining Inc. · read 2026-09-11
Buys long-term HPC leases at the Barber Lake site
In the third quarter of 2025, through our wholly-owned subsidiary Cipher Barber Lake LLC (“Cipher Barber Lake”), we entered into long-term HPC leases with Fluidstack USA II Inc. (“Fluidstack”) to construct a data center at our Barber Lake site (“Barber Lake” or the “Barber Lake Facility”), located near Colorado City, Texas, supported by a lease recognition agreement, pursuant to which Google LLC (“Google”) has agreed to backstop certain obligations of Fluidstack under our HPC leases with Fluidstack.
cifr-20251231 · Cipher Digital Inc. (formerly Cipher Mining Inc.) · read 2026-09-11
Every company Cipher Mining deals with, and its own other sites, are on the Cipher Mining page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
The Barber Lake Facility is being constructed on 250 acres of land owned by Cipher Barber Lake, and will have a gross capacity of 300 MW.
Cipher Barber Lake is targeting delivery of Barber Lake Phase I by September 30, 2026, and of Barber Lake Phase II by January 31, 2027.
Under the agreement, Cipher will deliver 168 MW of critical IT load, supported by a maximum of 244 MW of gross capacity, at its Barber Lake site in Colorado City, Texas.
at its Barber Lake site in Colorado City, Texas