Chirisa Technology Parks / Chester / Virginia / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
H100, B200 · 88,428 H100e · 82 MW, estimated
Used by OpenAI
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to PJM Interconnection, LLC.
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
250,000 sq. ft. purpose-built data center
Status: Fully leased and operational
CTP Campus, Richmond, VA
CTP-01 – fully leased 250,000 sq. ft. purpose-built data center 70,000 sq. ft. Grade A office space 28MW utility power Status: Fully leased and operational
CTP Campus, Richmond, VA 230-acre campus 4 DCs master planned for development
known as CTP-01, was recently leased to CoreWeave
In Richmond, Virginia, CTP will be expanding its existing 300-acre campus in the Meadowville Technology Park to provide up to one million sq ft in partnership with PowerHouse.
Located in Meadowville Technology Park, equi-distant from Ashburn, VA and Virginia Beach cable landing stations, Digital Fortress Richmond provides connectivity with a newly constructed east/west, fully diverse multi-duct fiber system just 4ms of one-way latency to major connectivity hubs.
Digital Fortress operates eight state-of-the-art colocation facilities, which are located in Washington, Illinois, New Jersey, and Oregon.
Have a correction to this record? Include a source so a maintainer can review it.