CDC Data Centres / Laverton / Victoria / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
Every figure here is one an operator or a filing states, with the sentence it comes from one click away. Nothing is estimated, and an absent figure is rendered as absent rather than left out.
A power or accelerator figure appears above only where an operator or a filing states it. The footprint in the plate's caption is measured from the traced outline rather than published by anyone, which is why it sits there and not in this grid: it is not a capacity figure and it must never be read as the input to one.
Who is stated to occupy this building, and whether any of what is inside it can be bought. Both are claims a source has to make: GPUQuant records a tenant, a partner or a customer only where one is named in a quote.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
The address on the record, the place it belongs to, and the cloud regions whose named area GPUQuant has tested it against.
GPUQuant records no cloud region relation for this facility. That means neither the geometry test nor a provider statement has put it inside a named area, not that it is unconnected to any cloud.
How this record was built and when it was last checked. A re-run appends a revision rather than overwriting a fact, because the previous value was true when it was recorded and the change is itself the content.
Our second Melbourne campus at Laverton is currently under construction. When complete, it is set to add over 400 MW of additional capacity to the region.
At present, our BK1 data centre in Brooklyn is fully operational, catering to the highest density customer demand. Both the remaining Brooklyn Campus facilities and the entirety of our Laverton Campus are currently under construction, with significant developments anticipated in the near future.
Work commenced today on the site of a new 150 megawatt data campus in Laverton, which is set to generate thousands of local jobs and inject more than $2.7 billion into the economy during construction.
Progress secured in Victoria. We provide data centre facilities built to support the organisations critical to the progress of the state and the nation.
Building outlines © OpenStreetMap contributors, ODbL. Licence