Bulk Infrastructure / Øvrebø / Agder / NO
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
B200 · 50,773 H100e · 42 MW, estimated
Used by OpenAI
2,048 chips · NVIDIA H100 SXM5 80GB · 2,048 H100e · 3 MW, estimated · since 2024-03
Used by Cloud
2,048 chips · NVIDIA H100 SXM5 80GB · 2,048 H100e · 3 MW, estimated · since 2024-03
Used by Cloud
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2025, from the source named under them.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Located in Southern Norway's Agder region, just outside Kristiansand, Norway with good access to international flights, the campus lies on a 300-hectare (3km²) site located next to the largest transformer station in Europe, with direct and redundant connections to multiple hydropower stations.
Massive scalability across 3km² and up to 1GW power, N01 meets the need for high-density computing, colocation, and purpose-built facilities.
Bulk has secured 400 MW at the site with potential up to 1GW.
CoreWeave partners with Bulk Infrastructure for one of the largest NVIDIA AI deployments in Europe
This deployment aims to significantly enhance compute capacity in Norway and is expected to be operational by Summer 2025.
"address1": "St\u00f8levegen 39"
Have a correction to this record? Include a source so a maintainer can review it.