Applied Digital / Ellendale / North Dakota / US
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
B200 · 93,482 H100e · 68 MW, estimated
Used by OpenAI
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Published figures for 2023, from the source named under them.
United States as a whole ran at 384 g of CO2 per kWh in 2025, from Ember.
Those plants report to Midcontinent Independent Transmission System Operator, Inc...
A radius, not a supply. No public source states which plant serves which site, and nothing here says one does.
Who Applied Digital buys from and sells to, each relationship carrying the source that states it.
None recorded.
Buys Datacenter leases at Polaris Forge 1
On August 28, 2025, our subsidiary APLD ELN-02 C LLC entered into a third lease (the “Building 4 Lease”) with CoreWeave for an additional 150 MW, bringing the total contracted capacity at Polaris Forge 1 under our CoreWeave leases to 400 MW.
Applied Digital Corp. Form 10-K for fiscal year ended May 31, 2026 · Applied Digital Corp. · read 2026-09-11
Every company Applied Digital deals with, and its own other sites, are on the Applied Digital page.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Polaris Forge 1 is located in Ellendale, North Dakota, where Applied Digital has operated since 2021 and built long-standing relationships with local leaders, partners, and community stakeholders.
today announced it has achieved Ready for Service for Phase 1 of Building 2 at Polaris Forge 1, delivering 75 MW of operational AI capacity to its customer on schedule and bringing total live capacity at the campus to 175 MW.
Applied Digital will deliver 250 megawatts (MW) of critical IT load to host CoreWeave