Apple / Reno / Nevada / US
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
Who Apple buys from and sells to, each relationship carrying the source that states it.
Supplies Fabrication of advanced silicon at Fab 21 in Arizona
The fund’s expansion includes a multibillion-dollar commitment from Apple to produce advanced silicon in TSMC’s Fab 21 facility in Arizona.
Apple will spend more than $500 billion in the U.S. over the next four years · Apple (Apple Newsroom) · read 2026-09-06
Supplies MDM (thin modem) products
Apple purchases our MDM (or thin modem) products, which do not include our integrated application processor technology, and which have lower revenue and margin contributions than our combined modem and application processor products.
qcom-20250928 (Form 10-K) · QUALCOMM Incorporated · read 2026-09-11
Supplies Semiconductor packaging and test services
Direct sales to Apple and Qualcomm accounted for 29.8% and 11.1% of our net sales, respectively, for the year ended December 31, 2025.
amkr-20251231 (Form 10-K 2025) · Amkor Technology, Inc. · read 2026-09-11
None recorded.
Every company Apple deals with, and its own other sites, are on the Apple page.
None recorded.
5 other sites on this map.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Apple's Reno data center, opened in 2012, takes advantage of the mild climate by cooling its servers with outside air whenever possible.
we own and operate in Prineville, Oregon; Reno, Nevada; Maiden,
In the Truckee River Basin, home to our Reno Data Center, we
Building outlines © OpenStreetMap contributors, ODbL. Licence