National Institute of Advanced Industrial Science and Technology (AIST) / Kashiwa / Chiba / JP
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
6,128 chips · NVIDIA H200 SXM · 6,128 H100e · 9 MW, estimated · since 2025-01
Used by industry, academia, and government in Japan
5,312 chips · NVIDIA A100 SXM4 40 GB · 303 H100e · 3 MW · since 2021-05
Used by industry, academia, and government in Japan
4,352 chips · NVIDIA Tesla V100 SXM2 · 275 H100e · 3 MW, estimated · since 2018-06
Used by industry, academia, and government in Japan
This is captive capacity. The operator does not sell GPU-hours, so no price on GPUQuant refers to it.
None recorded.
Published figures for 2025, from the source named under them.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
National Institute of Advanced Industrial Science and Technology (AIST) has developed from scratch on AIST Kashiwa Center within the Kashiwa II Campus of the University of Tokyo.
is an open computing infrastructure for both developing AI technology and bridging AI technology into the industry and the real world, constructed by National Institute of Advanced Industrial Science and Technology (AIST), and operated by AIST Solutions Co. (AISol).
ABCI started full-scale operation in August 2018, was upgraded to ABCI 2.0 in May 2021, and was upgraded to ABCI 3.0 in January 2025.
The AI data center building has a power capacity of 5.2 MW, commensurate with its cooling capacity.
The AI Data Center building is a low-cost, lightweight “Warehouse”-like structure, with the server room occupying the majority of its interior.