Loading benchmark data
Adam / Alcalá de Henares / Madrid / ES
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
¿Dónde estamos? Tenemos un Data Center Alcalá de Henares:
C/ Punto Mobi, 1 Parque Tecnológico TecnoAlcalá – 28805 Alcalá de Henares – Madrid.
Potencia eléctrica 1ª fase: 2 MW en configuración 2N.
Superficie de 3.500 m 2 de los cuales 3.000 m 2 están construidos en diseño modular.
"name": "Adam - MAD", "aka": "", "name_long": "", "website": "http://www.adam.es"
Facility registry data from PeeringDB. Licence