Tokyo West 1 (TKW1) is a 31 MW multi-phase data center campus consisting of three 3-story buildings, approximately 10 MW per building, and an on-site substation with 50 MVA power secured by TEPCO.
Building 2 (TKW1-2) will provide 10 MW IT load and will be customer ready in 2027
34 km from Tokyo Central Business District
Ada Infrastructure is poised to serve the Japan market with strategic locations in Tokyo and Osaka.