Loading benchmark data
Ada Infrastructure / London / England / GB
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
No provider names an area that GPUQuant has recorded as containing this building.
London, England, GB
A source naming a city gives a city-precision record and no outline. Inferring one from a satellite image would be fabrication with a map legend on it.
A power or accelerator figure appears above only where an operator or a filing states it.
This operator sells space and power, not GPU-hours. No price on GPUQuant refers to it.
None recorded.
Every change is appended, so an earlier value stays readable beside the one that replaced it.
Approved 210MW data center campus in one of Europe’s most capacity-constrained markets is under construction and ready to scale.
Ada Infrastructure’s flagship campus in East London’s Royal Docks is strategically positioned to support the growing demands of hyperscale, cloud, and AI/ML workloads.
Located in one of London's four major data center markets, Docklands is the largest planned data centre campus in London and is one mile from its largest internet exchanges. Building 1 is scheduled to be customer ready in 2027 and will provide 70 MW of IT load across 10 liquid cooling ready data halls.